mirror of
https://github.com/affaan-m/everything-claude-code.git
synced 2026-05-18 23:03:06 +08:00
docs: refresh release readiness evidence
This commit is contained in:
@@ -2,8 +2,8 @@
|
||||
|
||||
This dashboard is generated by `npm run operator:dashboard`. It is an operator snapshot, not release approval.
|
||||
|
||||
Generated: 2026-05-18T10:36:36.770Z
|
||||
Commit: cdc92de42ad504ca0ca8fe58e4fcded68fc52be6
|
||||
Generated: 2026-05-18T13:12:35.523Z
|
||||
Commit: 680aeff0fb9a8598858e3105ba4742973ef386ab
|
||||
Status: work remaining
|
||||
|
||||
## Current Status
|
||||
@@ -27,7 +27,7 @@ Status: work remaining
|
||||
| Build ITO-44 completion dashboard into a repeatable command | npm run operator:dashboard | complete | operator:dashboard package script exists | keep generated dashboard attached to publication evidence |
|
||||
| ECC 2.0 preview pack ready | docs/releases/2.0.0-rc.1/preview-pack-manifest.md | current | preview pack manifest and deterministic smoke gate are in-tree | repeat clean-checkout preview-pack smoke before publication |
|
||||
| Include Hermes specialized skills safely | docs/HERMES-SETUP.md and skills/hermes-imports/SKILL.md | current | Hermes setup/import artifacts are covered by preview-pack smoke | repeat preview-pack smoke before release review |
|
||||
| Prepare name-change, Claude plugin, and Codex plugin paths | naming-and-publication-matrix plus publication-readiness | in_progress | naming matrix and plugin readiness gates exist | real tag/push, marketplace submission, and final channel choice remain approval-gated |
|
||||
| Prepare name-change, Claude plugin, and Codex plugin paths | naming-and-publication-matrix plus release-name-plugin-publication checklist plus publication-readiness | in_progress | naming matrix, release publication checklist, and plugin readiness gates exist | real tag/push, marketplace submission, and final channel choice remain approval-gated |
|
||||
| Prepare release notes, articles, tweets, and push notifications | docs/releases/2.0.0-rc.1 social and release-copy files | in_progress | release notes, X thread, LinkedIn draft, and URL ledger are present | final live release/npm/plugin/billing URLs and publish approval still pending |
|
||||
| Advance AgentShield enterprise iteration | AgentShield PR evidence plus enterprise roadmap | in_progress | AgentShield policy promotion `reviewItems` landed in `87aec47`; package-manager hardening drift detection landed in `28d08c7`; workflow action runtime pins were refreshed in `659f569`; npm age-gate guidance was corrected in `ee585cd`; package-manager hardening Action outputs landed in `1124535`; policy-promotion Action outputs and runtime-smoke job-summary evidence landed in `1593925`; ECC-Tools consumes those outputs in `8658951`, surfaces operator-readable status/pack/count/digest telemetry in `16c537f`, and renders hosted promotion judge audit traces in `05d4e82`; all are mirrored in the GA roadmap | deepen live operator approval/readback after Marketplace/payment gates |
|
||||
| Advance ECC Tools native payments and AI-native harness-agnostic app | ECC Tools PR evidence, billing gate, hosted analysis lanes | in_progress | billing announcement gate, hosted analysis lanes, AgentShield fleet-summary consumption, hosted finding evidence paths, harness-route policy linking, policy-promotion Action-output telemetry, operator-visible promotion output details, hosted promotion judge audit traces, billing announcement preflight, aggregate production billing KV readback, Wrangler OAuth readback, target-account billing readback, provenance-aware Marketplace billing-state gates, and sanitized Marketplace plan/action provenance counts are mirrored in the GA roadmap | create or verify Marketplace-managed Pro target billing-state with webhook provenance, then run `billing:kv-readback -- --wrangler --wrangler-bin ./node_modules/.bin/wrangler --account <github-login> --require-ready`, followed by the live announcement gate |
|
||||
|
||||
@@ -7,9 +7,9 @@ npm publication, plugin tag, marketplace submission, or announcement post.
|
||||
|
||||
| Field | Evidence |
|
||||
| --- | --- |
|
||||
| Upstream main | `04d4d81938b20ac2bac1f0025145ab77d6a59f5f` |
|
||||
| Upstream main | `680aeff0fb9a8598858e3105ba4742973ef386ab` |
|
||||
| Git remote | `https://github.com/affaan-m/everything-claude-code.git` |
|
||||
| Evidence scope | Current `main` after PR #1970 workflow-security validator bypass fixes, PR #1971 metrics bridge cost-reporting fixes, PR #1972 `uncloud` skill merge, PR #1973 stale script cleanup, issue #1974 cost-reporting verification/closure, PR #1976 OpenAI/AstraFlow provider response guards, catalog/operator dashboard refresh, ECC-Tools Wrangler OAuth billing readback mirror, Mini Shai-Hulud/TanStack protection recheck, defensive-deny IOC scanner hardening, current-head CI/security scan, work-items sync, and Linear progress sync |
|
||||
| Evidence scope | Current `main` after PR #1970 workflow-security validator bypass fixes, PR #1971 metrics bridge cost-reporting fixes, PR #1972 `uncloud` skill merge, PR #1973 stale script cleanup, issue #1974 cost-reporting verification/closure, PR #1976 OpenAI/AstraFlow provider response guards, catalog/operator dashboard refresh, ECC-Tools Wrangler OAuth billing readback mirror, Mini Shai-Hulud/TanStack protection recheck, defensive-deny IOC scanner hardening, release name/plugin publication checklist, readiness/smoke gate enforcement for that checklist, current-head CI/security scan, work-items sync, and Linear progress sync |
|
||||
| Local status caveat | `git status --short --branch` showed `## main...origin/main` plus unrelated untracked `docs/drafts/`; generated evidence files are committed after the source snapshot they describe |
|
||||
|
||||
The actual release operator should repeat all publish-facing checks from the
|
||||
@@ -24,7 +24,7 @@ final release commit with a strictly clean checkout before publishing.
|
||||
| Discussion audit | `npm run discussion:audit -- --json` | Ready; 58 sampled discussions in `affaan-m/everything-claude-code`, 0 needing maintainer touch, 0 answerable discussions missing accepted answer, and 0 fetch errors |
|
||||
| Platform audit | `node scripts/platform-audit.js --json --allow-untracked docs/drafts/` | Ready; tracked repos report 0 open PRs, 0 open issues, 0 discussion maintainer-touch gaps, 0 answerable Q&A missing accepted answers, and 0 blocking dirty files |
|
||||
| Work-items sync | `node scripts/work-items.js sync-github --repo <tracked-repo>` for five tracked repos; `node scripts/status.js --json`; `node scripts/work-items.js list --json` | All five tracked repos synced with 0 open PRs/issues and no changed work items; local status reports 0 open, 0 blocked, and 0 closed work items |
|
||||
| Operator dashboard | `node scripts/operator-readiness-dashboard.js --markdown --allow-untracked docs/drafts/ --write docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-18.md` | Generated current dashboard for `fb4b0c8dced77b8097b98b08c9091e554b6878a5`; dashboard ready true, publication ready false because release, npm, plugin, billing, and announcement gates are approval-gated; ECC Tools target-account billing readback is now the documented native-payments gate |
|
||||
| Operator dashboard | `node scripts/operator-readiness-dashboard.js --markdown --allow-untracked docs/drafts/ --write docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-18.md` | Generated current dashboard for `680aeff0fb9a8598858e3105ba4742973ef386ab`; dashboard ready true, publication ready false because release, npm, plugin, billing, and announcement gates are approval-gated; ECC Tools target-account billing readback remains the documented native-payments gate; the naming/plugin row now requires the release-name/plugin publication checklist |
|
||||
|
||||
Tracked repositories in the platform audit and work-items sync were:
|
||||
|
||||
@@ -47,7 +47,9 @@ Tracked repositories in the platform audit and work-items sync were:
|
||||
| PR #1976 | Merged provider response hardening for OpenAI-compatible and AstraFlow providers; main includes `eb0d8939` follow-up guards for empty/filtered provider choices, missing OpenAI `response.usage`, shared filtered-response error text, and credential-less provider construction validation |
|
||||
| Provider guard validation | `uv run --extra dev pytest -q tests/test_provider_tools.py tests/test_astraflow_provider.py`, `uv run --extra dev pytest -q`, `node tests/run-all.js`, and `git diff --check` passed before merging #1976 follow-up into main: 11 provider-focused Python tests, 76 full Python tests, 2509 Node tests, and clean whitespace checks |
|
||||
| Defensive-deny IOC scanner hardening | Pushed `04d4d819` so explicit Claude `permissions.deny` IOC entries are treated as defensive controls while the same IOC still fails in hooks, tasks, scripts, locks, and payload files; local `npm test` passed 2511/2511 and current-head CI `26017368895` passed 37/37 |
|
||||
| Clean-worktree preview-pack smoke | Detached worktree at `742bc58d9748184dc6fd54ef42ffcf165c9d1360`; `node scripts/preview-pack-smoke.js --root <worktree> --format json` passed 5/5 with digest `59bbf2630a44`; required artifacts, final verification commands, Hermes public sanitization boundary, and approval-gated publication blockers were all preserved |
|
||||
| Release name/plugin publication checklist | Pushed `6c0fbfb6` to add `docs/releases/2.0.0-rc.1/release-name-plugin-publication-checklist-2026-05-18.md`; the artifact freezes rc.1 as Everything Claude Code / ECC, keeps npm `ecc-universal`, keeps Claude/Codex plugin slug `ecc`, cites current Anthropic/OpenAI plugin publication paths, and blocks rename/npm publish/plugin tag/submission/billing/social actions until final release evidence exists; GitHub Actions CI `26034898420` passed |
|
||||
| Dashboard and preview-pack checklist enforcement | Added `680aeff0` so `scripts/operator-readiness-dashboard.js` and `scripts/preview-pack-smoke.js` require the release-name/plugin publication checklist; local dashboard and smoke tests passed and preview-pack smoke now enforces 26 required artifacts |
|
||||
| Clean-worktree preview-pack smoke | Detached worktree at `680aeff0fb9a8598858e3105ba4742973ef386ab`; `node scripts/preview-pack-smoke.js --root <worktree> --format json` passed 5/5 with digest `0ed831dbd0cf`; 26 required artifacts, final verification commands, Hermes public sanitization boundary, and approval-gated publication blockers were all preserved |
|
||||
| Public queues | Rechecked after the merge and issue-closure batch; 0 PRs, 0 issues, and 0 discussion gaps remain across tracked repos |
|
||||
|
||||
## Supply-Chain And Security Evidence
|
||||
@@ -107,8 +109,9 @@ Tracked repositories in the platform audit and work-items sync were:
|
||||
## Result
|
||||
|
||||
The tracked public PR queue, issue queue, discussion queue, local work-items
|
||||
bridge, and Mini Shai-Hulud/TanStack protection loop are current on
|
||||
May 18, 2026 for current `main` through `aa634df9`, with follow-up ECC Tools
|
||||
billing-gate hardening in `632e059`. This improves publication readiness but
|
||||
does not replace the approval-gated release, package, plugin, billing, and
|
||||
announcement steps in `publication-readiness.md`.
|
||||
bridge, release-name/plugin publication gate, and Mini Shai-Hulud/TanStack
|
||||
protection loop are current on May 18, 2026 for current `main` through
|
||||
`680aeff0`, with follow-up ECC Tools billing-gate hardening in `632e059`.
|
||||
This improves publication readiness but does not replace the approval-gated
|
||||
release, package, plugin, billing, and announcement steps in
|
||||
`publication-readiness.md`.
|
||||
|
||||
Reference in New Issue
Block a user