mirror of
https://github.com/affaan-m/everything-claude-code.git
synced 2026-05-20 07:43:07 +08:00
docs: sync late May 19 release roadmap state
This commit is contained in:
committed by
Affaan Mustafa
parent
9819626459
commit
b3c015c744
@@ -22,6 +22,12 @@ partner/sponsor funnel, consulting/talk funnel, and social launch plan.
|
||||
- The public repo identity is now `affaan-m/ECC`; release, package, plugin,
|
||||
workflow, and launch-copy surfaces should use that URL for current public
|
||||
links.
|
||||
- The late May 19 queue drain added the deterministic `release:approval-gate`
|
||||
on ECC `main`, merged ECC-Tools billing-announcement redaction hardening, and
|
||||
cleared the JARVIS Dependabot/deploy repair tail. The tracked platform audit
|
||||
is now green with 0 open PRs, 0 open issues, and 0 discussion gaps across all
|
||||
five tracked repos, but release/publication actions remain owner and live-URL
|
||||
gated.
|
||||
- The ECC 2.0 release story should lead with the product shape directly:
|
||||
harness-native operator system, reusable skills/rules/hooks/MCP conventions,
|
||||
`ecc2/` alpha control plane, Hermes as optional operator shell, and ECC Tools
|
||||
@@ -38,10 +44,9 @@ As of 2026-05-19:
|
||||
`affaan-m/agentshield`, `affaan-m/JARVIS`, `ECC-Tools/ECC-Tools`, and
|
||||
`ECC-Tools/ECC-website`: the latest `platform-audit` sweep found 0 open PRs,
|
||||
0 open issues, 0 discussion maintainer-touch gaps, 0 answerable Q&A missing
|
||||
accepted answers, and 0 blocking dirty files when allowing the unrelated
|
||||
local `docs/drafts/` directory. The May 18 sync also refreshed
|
||||
`scripts/work-items.js sync-github` across all five tracked repos, leaving
|
||||
no open or blocked local work items.
|
||||
accepted answers, and 0 blocking dirty files. The current
|
||||
`scripts/work-items.js list --json` output also reports `totalCount: 0`, so
|
||||
there are no open or blocked local work items in the SQLite bridge.
|
||||
- Owner-wide queue cleanup is also inside the requested budget:
|
||||
`docs/releases/2.0.0-rc.1/owner-queue-cleanup-2026-05-18.md` records the
|
||||
live `gh search` sweep that closed 24 stale dependency-bot PRs and 72 stale
|
||||
@@ -85,19 +90,24 @@ As of 2026-05-19:
|
||||
current May 19 queue-zero state, canonical ECC identity merge, release video
|
||||
suite gate, partner/sponsor/talk outreach pack, owner approval packet
|
||||
(`owner-approval-packet-2026-05-19.md`), preview-pack smoke digest
|
||||
`531328aaaa53`, local 2560-test suite, PR #2001 merge and GitHub Actions run
|
||||
`531328aaaa53`, local 2568-test suite, PR #2001 merge and GitHub Actions run
|
||||
`26102500291` success, PR #2002's owner-approval dashboard gate refresh and
|
||||
GitHub Actions run `26103853507`, PR #2004's Linear readiness evidence sync
|
||||
and GitHub Actions run `26105012698`, plus PR #2005's post-PR #2004
|
||||
evidence refresh and GitHub Actions run `26106321921`, PR #2008's supply-chain
|
||||
evidence gate fix and GitHub Actions run `26108473648`, post-PR #2006 main CI
|
||||
run `26109953093`, and PR #2009's project-registry hygiene GitHub Actions run
|
||||
`26111313938`, post-PR #2009 main CI run `26111946778`, and post-PR #2011
|
||||
GateGuard main CI run `26113695068`. The May 19 Linear sync document remains
|
||||
the current external project status surface, and the
|
||||
supply-chain gate now also records the `@types/node@25.7.0` pin and
|
||||
`brace-expansion` lock refresh needed for current npm audit/signature
|
||||
verification.
|
||||
`26111313938`, post-PR #2009 main CI run `26111946778`, post-PR #2011
|
||||
GateGuard main CI run `26113695068`, and post-PR #2013 release-approval-gate
|
||||
main CI run `26128749863`. The late May 19 sync target also includes
|
||||
ECC-Tools PR #79 billing-announcement redaction hardening and JARVIS PR #15
|
||||
/ PR #16 queue/deploy repair, with JARVIS main CI, CodeQL, and Deploy green
|
||||
after the workflow repair. The Linear external project status surface now has
|
||||
both the post-PR #2002 sync document and the late-pass document
|
||||
`ecc-may-19-late-queue-zero-and-release-gate-sync-1c26f65e6b3f`, plus project
|
||||
comment `d42bf0e2-7a8e-4934-9f3f-e281498ee805`. The supply-chain gate now
|
||||
also records the `@types/node@25.7.0` pin and `brace-expansion` lock refresh
|
||||
needed for current npm audit/signature verification.
|
||||
- `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-19.md`
|
||||
regenerates the ITO-44 prompt-to-artifact dashboard from live platform audit
|
||||
evidence: PR queue, issue queue, discussion queue, local worktree gate,
|
||||
@@ -733,7 +743,7 @@ As of 2026-05-19:
|
||||
|
||||
- Keep public PRs and issues below 20, with zero as the preferred release-lane
|
||||
target.
|
||||
- Maintain 70/70 harness audit and 21/21 observability readiness after every
|
||||
- Maintain 80/80 harness audit and 21/21 observability readiness after every
|
||||
GA-readiness batch.
|
||||
- Do not publish release or social announcements until the GitHub release,
|
||||
npm/package state, billing state, and plugin submission surfaces are verified
|
||||
@@ -741,7 +751,9 @@ As of 2026-05-19:
|
||||
- Do not treat closed stale PRs as discarded. Pair each cleanup batch with a
|
||||
salvage pass: inspect the closed diffs, port useful compatible work on
|
||||
maintainer-owned branches, and credit the source PR.
|
||||
- Do not create new Linear issues until the active issue limit is cleared.
|
||||
- Use Linear project documents/comments for project-level updates because
|
||||
project status updates are disabled in this workspace; create or update
|
||||
issues when a lane needs a durable execution owner.
|
||||
|
||||
## Prompt-To-Artifact Execution Checklist
|
||||
|
||||
@@ -750,12 +762,12 @@ is not complete unless the evidence column exists and has been freshly verified.
|
||||
|
||||
| Prompt requirement | Required artifact or gate | Current evidence | Status |
|
||||
| --- | --- | --- | --- |
|
||||
| Keep public PRs below 20 | Repo-family PR recheck | 0 open PRs across `ECC`, AgentShield, JARVIS, `ECC-Tools/ECC-Tools`, and `ECC-Tools/ECC-website` on 2026-05-19 after merging PR #2004 and refreshing platform audit evidence | Complete |
|
||||
| Keep public PRs below 20 | Repo-family PR recheck | 0 open PRs across `ECC`, AgentShield, JARVIS, `ECC-Tools/ECC-Tools`, and `ECC-Tools/ECC-website` on the late 2026-05-19 platform audit after merging ECC PR #2013, ECC-Tools PR #79, JARVIS PR #15, and JARVIS PR #16 | Complete |
|
||||
| Keep public issues below 20 | Repo-family issue recheck | 0 open issues across `ECC`, AgentShield, JARVIS, `ECC-Tools/ECC-Tools`, and `ECC-Tools/ECC-website` on 2026-05-19 after the live platform audit refresh | Complete |
|
||||
| Manage repository discussions | Repo-family discussion recheck plus response playbook | Platform audit reports 0 discussion maintainer-touch gaps and 0 answerable Q&A missing accepted answers; trunk has 59 total discussions after #2003 was routed with a maintainer response; `docs/architecture/discussion-response-playbook.md` distinguishes support, maintainer coordination, stale/concluded, release, informational, and security-sensitive response paths | Complete |
|
||||
| Manage PR discussions | PR review/comment closure plus merge/close state | ECC #1990-#2011 merged through the harness audit, canonical identity, release video suite, growth outreach, evidence refresh, visual QA, suite-count, owner-approval packet, owner-approval dashboard gate, Linear readiness evidence, supply-chain evidence gate, per-project Claude Code adapter, continuous-learning project-registry hygiene, and GateGuard quoted git introspection batch; no open tracked PRs remain | Complete |
|
||||
| Manage PR discussions | PR review/comment closure plus merge/close state | ECC #1990-#2013 merged through the harness audit, canonical identity, release video suite, growth outreach, evidence refresh, visual QA, suite-count, owner-approval packet, owner-approval dashboard gate, Linear readiness evidence, supply-chain evidence gate, per-project Claude Code adapter, continuous-learning project-registry hygiene, GateGuard quoted git introspection, and deterministic release-approval gate batch; ECC-Tools #79 and JARVIS #15/#16 also merged; no open tracked PRs remain | Complete |
|
||||
| Salvage useful stale work | `docs/stale-pr-salvage-ledger.md` plus `docs/legacy-artifact-inventory.md` | Ledger records salvaged, superseded, skipped, and manual-review tails; #1815-#1818 added cost tracking, skill scout, frontend design guidance, code-reviewer false-positive guardrails, and the May 12 gap pass; #1687, #1609, #1563, #1564, and #1565 localization tails are attached to Linear ITO-55 for language-owner review and no automatic import remains release-blocking | Complete; repeat legacy scan before release |
|
||||
| ECC 2.0 preview pack ready | Release docs, quickstart, publication readiness, release notes | `docs/releases/2.0.0-rc.1/` and readiness docs are in-tree; May 19 evidence records queue-zero state, canonical ECC identity, release video suite, growth outreach pack, owner approval packet, local 2560-test suite, PR #2001 merge and GitHub Actions run `26102500291`, PR #2002 owner-approval dashboard gate refresh and GitHub Actions run `26103853507`, PR #2004 Linear readiness evidence sync and GitHub Actions run `26105012698`, PR #2008 supply-chain evidence gate CI run `26108473648`, post-PR #2006 main CI run `26109953093`, PR #2009 project-registry hygiene GitHub Actions run `26111313938`, post-PR #2009 main CI run `26111946778`, post-PR #2011 GateGuard main CI run `26113695068`, May 19 operator dashboard, `owner-approval-packet-2026-05-19.md`, `release-approval-gate.js`, and preview-pack smoke digest `531328aaaa53` | Needs final release approval |
|
||||
| ECC 2.0 preview pack ready | Release docs, quickstart, publication readiness, release notes | `docs/releases/2.0.0-rc.1/` and readiness docs are in-tree; May 19 evidence records queue-zero state, canonical ECC identity, release video suite, growth outreach pack, owner approval packet, local 2568-test suite, PR #2001 merge and GitHub Actions run `26102500291`, PR #2002 owner-approval dashboard gate refresh and GitHub Actions run `26103853507`, PR #2004 Linear readiness evidence sync and GitHub Actions run `26105012698`, PR #2008 supply-chain evidence gate CI run `26108473648`, post-PR #2006 main CI run `26109953093`, PR #2009 project-registry hygiene GitHub Actions run `26111313938`, post-PR #2009 main CI run `26111946778`, post-PR #2011 GateGuard main CI run `26113695068`, post-PR #2013 release-approval main CI run `26128749863`, May 19 operator dashboard, `owner-approval-packet-2026-05-19.md`, `release-approval-gate.js`, and preview-pack smoke digest `531328aaaa53` | Needs final release approval |
|
||||
| Hermes specialized skills included safely | Hermes setup/import docs and sanitized skill surface | Hermes setup and import playbook are public; secrets stay local | Needs final release review |
|
||||
| Naming and rename readiness | Naming matrix across package/plugin/docs/social surfaces | `docs/releases/2.0.0-rc.1/naming-and-publication-matrix.md` records current package, repo, Claude plugin, Codex plugin, OpenCode, and npm availability evidence | Complete for rc.1; post-rc rename remains future work |
|
||||
| Claude and Codex plugin publication | Contact/submission path with required artifacts and status | Publication readiness, naming matrix, and May 12 dry-run evidence document plugin validation, clean-checkout Claude tag/install smoke, and Codex marketplace CLI shape | Needs explicit approval for real tag/push and marketplace submission |
|
||||
@@ -764,9 +776,9 @@ is not complete unless the evidence column exists and has been freshly verified.
|
||||
| ECC Tools next-level app | Billing audit, PR checks, deep analyzer, sync backlog, evaluator/RAG corpus, analysis-depth readiness, hosted execution planning, hosted CI diagnostics, hosted security evidence review, hosted harness compatibility audit, hosted reference-set evaluation, hosted AI routing/cost review, hosted team backlog routing, hosted depth-plan check-run, PR-comment hosted job dispatch, hosted job result history/check-runs, hosted result status command, status-aware depth-plan recommendations, hosted promotion readiness, hosted promotion output scoring, hosted promotion retrieval planning, hosted promotion judge contract, gated hosted promotion judge execution, hosted promotion judge audit trace, payment-announcement readiness, billing announcement preflight, aggregate production billing KV readback, Marketplace webhook provenance, target-account billing readback, Marketplace-source provenance counts, AgentShield fleet-summary hosted routing, hosted finding evidence paths, harness-route policy linking, policy-promotion Action-output hosted telemetry, and operator-visible promotion output values | PRs #26-#43 plus #53-#78 landed with test evidence, including AgentShield evidence-pack gap routing, canonical bundle recognition, supply-chain signature gates, PR draft follow-up Linear tracking, evidence-backed/deep-ready repository classification, the `/api/analysis/depth-plan` hosted job plan, `/api/analysis/jobs/ci-diagnostics`, `/api/analysis/jobs/security-evidence-review`, `/api/analysis/jobs/harness-compatibility-audit`, `/api/analysis/jobs/reference-set-evaluation`, `/api/analysis/jobs/ai-routing-cost-review`, `/api/analysis/jobs/team-backlog-routing`, the `ECC Tools / Hosted Depth Plan` check-run, `/ecc-tools analyze --job ...` PR-comment dispatch, non-blocking per-hosted-job result check-runs backed by 30-day result cache records, `/ecc-tools analyze --job status` cache lookup, cache-aware next-job recommendations in the depth-plan check-run, the `ECC Tools / Hosted Promotion Readiness` corpus-backed PR check-run, deterministic hosted-output scoring against cached completed job artifacts/findings, ranked retrieval/model-prompt planning, the fail-closed `hosted-promotion-judge.v1` request contract, opt-in live model-judge execution behind hosted evidence, entitlement, budget, provider, executor, strict JSON, and citation gates, hosted promotion judge request fingerprints plus allowed-citation audit trails, a fail-closed `/api/billing/readiness` `announcementGate` for native GitHub payments claims, `npm run billing:announcement-gate` plus `--preflight` as the non-secret operator verifier, hosted security findings for AgentShield fleet summaries, an `Evidence` column in hosted finding comments/check-runs, hosted harness findings that route AgentShield fleet target paths to harness owners, ECC-Tools commit `8658951` routing AgentShield policy-promotion Action outputs into hosted security review and promotion-readiness scoring, ECC-Tools commit `16c537f` rendering policy-promotion status/pack/count/digest values directly in hosted security job comments/check-runs, ECC-Tools commit `05d4e82` rendering model-judge audit traces without exposing raw provider output, ECC-Tools commit `91a441b` adding the safe billing announcement preflight path, ECC-Tools commit `eb69412` recording the initial production readback state, ECC-Tools commit `95d0bec` adding `npm run billing:kv-readback` with aggregate account-billing and billing-state records but 0 Marketplace Pro billing-state records, ECC-Tools commit `2859678` requiring webhook-derived Marketplace provenance before announcement readiness, ECC-Tools commit `42653f9` adding Wrangler OAuth readback, ECC-Tools commit `632e059` adding sanitized target-account readback that requires both target key families before `--require-ready` can pass, and ECC-Tools commit `d5f60db` adding sanitized Marketplace plan/action provenance counts; the latest 2026-05-18 live Wrangler OAuth recheck found 256 account-billing records, 256 billing-state records, 197 Marketplace-source records, 4 Marketplace webhook-provenance records, all `Open Source`, and 0 Marketplace Pro records, then updated Linear ITO-61 with the data/provisioning blocker | Next work is create or verify Marketplace-managed Pro target billing-state with webhook provenance, configure target account plus `INTERNAL_API_SECRET`, then run `billing:kv-readback -- --wrangler --wrangler-bin ./node_modules/.bin/wrangler --account <github-login> --require-ready`, followed by the live announcement gate |
|
||||
| GitGuardian/Dependabot/CodeRabbit-style checks | Non-blocking taxonomy, deterministic follow-up checks, and local supply-chain gates | ECC-Tools risk taxonomy check plus follow-up signals landed, including Skill Quality, Deep Analyzer Evidence, Analyzer Corpus Evidence, RAG/Evaluator Evidence, PR Review/Salvage Evidence, and AgentShield evidence-pack evidence; #1846 added npm registry signature gates; #1848 added the supply-chain incident-response playbook and `pull_request_target` cache-poisoning validator guard; #1851 added the privileged checkout credential-persistence guard; AgentShield #78, JARVIS #13, and ECC-Tools #53 applied the same hardening outside trunk | Current supply-chain gate complete; deeper hosted review features remain future |
|
||||
| Harness-agnostic learning system | Audit, adapter matrix, observability, traces, promotion loop | Audit/adapters/observability gates plus `docs/architecture/evaluator-rag-prototype.md`, `examples/evaluator-rag-prototype/`, and ECC-Tools PR #40 define read-only stale-salvage, billing-readiness, CI-failure-diagnosis, harness-config-quality, AgentShield policy-exception, skill-quality evidence, deep-analyzer evidence, and RAG/evaluator comparison scenarios with trace, report, playbook, verifier, and predictive-check artifacts; ECC-Tools PRs #68-#72 now turn that corpus into a deterministic PR check-run gate with cached hosted-output scoring, ranked retrieval candidates, a model prompt seed, a fail-closed hosted model-judge request contract, and opt-in live model execution behind strict hosted-evidence gates | Deterministic hosted PR check, cached output scoring, retrieval planning, judge contract, and gated model execution integrated |
|
||||
| Linear roadmap is detailed | Linear project status plus repo mirror | Repo mirror exists and issue creation works again; the May 19 sync adds post-PR #2002 document `ecc-may-19-post-pr-2002-sync-64cef8f668e0`, project comment `a6411e3a-8c8e-4a58-adba-687e77d4c543`, ITO-44/47/48/49/51/54/56 issue comments, and In Progress state for ITO-47, ITO-48, ITO-49, ITO-51, ITO-54, and ITO-56; PR #2004 mirrors that sync into the repo evidence set | Needs recurring status updates after each significant merge batch |
|
||||
| Linear roadmap is detailed | Linear project document/comments plus repo mirror | Repo mirror exists and issue creation works again; the May 19 sync adds post-PR #2002 document `ecc-may-19-post-pr-2002-sync-64cef8f668e0`, project comment `a6411e3a-8c8e-4a58-adba-687e77d4c543`, ITO-44/47/48/49/51/54/56 issue comments, and In Progress state for ITO-47, ITO-48, ITO-49, ITO-51, ITO-54, and ITO-56; the late-pass batch adds document `ecc-may-19-late-queue-zero-and-release-gate-sync-1c26f65e6b3f`, project comment `d42bf0e2-7a8e-4934-9f3f-e281498ee805`, and ITO-44/50/54/56/61 comments for PR #2013, ECC-Tools #79, and JARVIS #15/#16 because project status updates are disabled in the workspace | Needs recurring document/comment updates after each significant merge batch |
|
||||
| Flow separation and progress tracking | Flow lanes with owner artifacts and update cadence | This roadmap defines lanes below and `docs/architecture/progress-sync-contract.md` makes GitHub/Linear/handoff/roadmap sync part of the readiness gate | Active |
|
||||
| Realtime Linear sync | Project comments while issue/status capacity is blocked; issues later | ECC-Tools #39 implements opt-in Linear API sync for deferred follow-up backlog items, and ECC-Tools #54 adds copy-ready PR drafts to that backlog when draft PR shells are not opened; `docs/architecture/progress-sync-contract.md` defines the local file-backed realtime boundary while issue capacity is blocked; May 18 live connector comments were posted to ITO-57 and the ECC platform project after project status updates returned disabled | Needs workspace capacity/config rollout for productized issue sync |
|
||||
| Realtime Linear sync | Project documents/comments plus issue comments for lane updates | ECC-Tools #39 implements opt-in Linear API sync for deferred follow-up backlog items, and ECC-Tools #54 adds copy-ready PR drafts to that backlog when draft PR shells are not opened; `docs/architecture/progress-sync-contract.md` defines the local file-backed realtime boundary; May 18 and May 19 live connector comments were posted to the ECC platform project and lane issues after project status updates returned disabled | Needs workspace config/product rollout for hosted issue sync |
|
||||
| Observability for self-use | Local readiness gate, traces, status snapshots, HUD/status contract, risk ledger, progress-sync contract | `npm run observability:ready` reports 21/21 | Complete for local gate |
|
||||
| Proper release and notifications | Release tag, npm publish state, plugin state, social posts | Publication readiness gate exists with May 12 dry-run and May 13 readiness evidence | Not complete; approval/live URLs required |
|
||||
|
||||
@@ -845,7 +857,7 @@ Acceptance:
|
||||
Zed-adjacent surfaces, dmux, Orca, Superset, Ghast, and terminal-only use.
|
||||
- Each adapter has supported assets, unsupported surfaces, install path,
|
||||
verification command, and risk notes.
|
||||
- Harness audit remains 70/70 and gains a public onramp that explains how teams
|
||||
- Harness audit remains 80/80 and gains a public onramp that explains how teams
|
||||
use the scorecard.
|
||||
- Reference findings are converted into concrete adapter, observability, or
|
||||
operator-surface deltas.
|
||||
|
||||
Reference in New Issue
Block a user