docs: sync late May 19 release roadmap state

This commit is contained in:
Affaan Mustafa
2026-05-19 18:51:25 -04:00
committed by Affaan Mustafa
parent 9819626459
commit b3c015c744
10 changed files with 74 additions and 43 deletions

View File

@@ -22,6 +22,12 @@ partner/sponsor funnel, consulting/talk funnel, and social launch plan.
- The public repo identity is now `affaan-m/ECC`; release, package, plugin, - The public repo identity is now `affaan-m/ECC`; release, package, plugin,
workflow, and launch-copy surfaces should use that URL for current public workflow, and launch-copy surfaces should use that URL for current public
links. links.
- The late May 19 queue drain added the deterministic `release:approval-gate`
on ECC `main`, merged ECC-Tools billing-announcement redaction hardening, and
cleared the JARVIS Dependabot/deploy repair tail. The tracked platform audit
is now green with 0 open PRs, 0 open issues, and 0 discussion gaps across all
five tracked repos, but release/publication actions remain owner and live-URL
gated.
- The ECC 2.0 release story should lead with the product shape directly: - The ECC 2.0 release story should lead with the product shape directly:
harness-native operator system, reusable skills/rules/hooks/MCP conventions, harness-native operator system, reusable skills/rules/hooks/MCP conventions,
`ecc2/` alpha control plane, Hermes as optional operator shell, and ECC Tools `ecc2/` alpha control plane, Hermes as optional operator shell, and ECC Tools
@@ -38,10 +44,9 @@ As of 2026-05-19:
`affaan-m/agentshield`, `affaan-m/JARVIS`, `ECC-Tools/ECC-Tools`, and `affaan-m/agentshield`, `affaan-m/JARVIS`, `ECC-Tools/ECC-Tools`, and
`ECC-Tools/ECC-website`: the latest `platform-audit` sweep found 0 open PRs, `ECC-Tools/ECC-website`: the latest `platform-audit` sweep found 0 open PRs,
0 open issues, 0 discussion maintainer-touch gaps, 0 answerable Q&A missing 0 open issues, 0 discussion maintainer-touch gaps, 0 answerable Q&A missing
accepted answers, and 0 blocking dirty files when allowing the unrelated accepted answers, and 0 blocking dirty files. The current
local `docs/drafts/` directory. The May 18 sync also refreshed `scripts/work-items.js list --json` output also reports `totalCount: 0`, so
`scripts/work-items.js sync-github` across all five tracked repos, leaving there are no open or blocked local work items in the SQLite bridge.
no open or blocked local work items.
- Owner-wide queue cleanup is also inside the requested budget: - Owner-wide queue cleanup is also inside the requested budget:
`docs/releases/2.0.0-rc.1/owner-queue-cleanup-2026-05-18.md` records the `docs/releases/2.0.0-rc.1/owner-queue-cleanup-2026-05-18.md` records the
live `gh search` sweep that closed 24 stale dependency-bot PRs and 72 stale live `gh search` sweep that closed 24 stale dependency-bot PRs and 72 stale
@@ -85,19 +90,24 @@ As of 2026-05-19:
current May 19 queue-zero state, canonical ECC identity merge, release video current May 19 queue-zero state, canonical ECC identity merge, release video
suite gate, partner/sponsor/talk outreach pack, owner approval packet suite gate, partner/sponsor/talk outreach pack, owner approval packet
(`owner-approval-packet-2026-05-19.md`), preview-pack smoke digest (`owner-approval-packet-2026-05-19.md`), preview-pack smoke digest
`531328aaaa53`, local 2560-test suite, PR #2001 merge and GitHub Actions run `531328aaaa53`, local 2568-test suite, PR #2001 merge and GitHub Actions run
`26102500291` success, PR #2002's owner-approval dashboard gate refresh and `26102500291` success, PR #2002's owner-approval dashboard gate refresh and
GitHub Actions run `26103853507`, PR #2004's Linear readiness evidence sync GitHub Actions run `26103853507`, PR #2004's Linear readiness evidence sync
and GitHub Actions run `26105012698`, plus PR #2005's post-PR #2004 and GitHub Actions run `26105012698`, plus PR #2005's post-PR #2004
evidence refresh and GitHub Actions run `26106321921`, PR #2008's supply-chain evidence refresh and GitHub Actions run `26106321921`, PR #2008's supply-chain
evidence gate fix and GitHub Actions run `26108473648`, post-PR #2006 main CI evidence gate fix and GitHub Actions run `26108473648`, post-PR #2006 main CI
run `26109953093`, and PR #2009's project-registry hygiene GitHub Actions run run `26109953093`, and PR #2009's project-registry hygiene GitHub Actions run
`26111313938`, post-PR #2009 main CI run `26111946778`, and post-PR #2011 `26111313938`, post-PR #2009 main CI run `26111946778`, post-PR #2011
GateGuard main CI run `26113695068`. The May 19 Linear sync document remains GateGuard main CI run `26113695068`, and post-PR #2013 release-approval-gate
the current external project status surface, and the main CI run `26128749863`. The late May 19 sync target also includes
supply-chain gate now also records the `@types/node@25.7.0` pin and ECC-Tools PR #79 billing-announcement redaction hardening and JARVIS PR #15
`brace-expansion` lock refresh needed for current npm audit/signature / PR #16 queue/deploy repair, with JARVIS main CI, CodeQL, and Deploy green
verification. after the workflow repair. The Linear external project status surface now has
both the post-PR #2002 sync document and the late-pass document
`ecc-may-19-late-queue-zero-and-release-gate-sync-1c26f65e6b3f`, plus project
comment `d42bf0e2-7a8e-4934-9f3f-e281498ee805`. The supply-chain gate now
also records the `@types/node@25.7.0` pin and `brace-expansion` lock refresh
needed for current npm audit/signature verification.
- `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-19.md` - `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-19.md`
regenerates the ITO-44 prompt-to-artifact dashboard from live platform audit regenerates the ITO-44 prompt-to-artifact dashboard from live platform audit
evidence: PR queue, issue queue, discussion queue, local worktree gate, evidence: PR queue, issue queue, discussion queue, local worktree gate,
@@ -733,7 +743,7 @@ As of 2026-05-19:
- Keep public PRs and issues below 20, with zero as the preferred release-lane - Keep public PRs and issues below 20, with zero as the preferred release-lane
target. target.
- Maintain 70/70 harness audit and 21/21 observability readiness after every - Maintain 80/80 harness audit and 21/21 observability readiness after every
GA-readiness batch. GA-readiness batch.
- Do not publish release or social announcements until the GitHub release, - Do not publish release or social announcements until the GitHub release,
npm/package state, billing state, and plugin submission surfaces are verified npm/package state, billing state, and plugin submission surfaces are verified
@@ -741,7 +751,9 @@ As of 2026-05-19:
- Do not treat closed stale PRs as discarded. Pair each cleanup batch with a - Do not treat closed stale PRs as discarded. Pair each cleanup batch with a
salvage pass: inspect the closed diffs, port useful compatible work on salvage pass: inspect the closed diffs, port useful compatible work on
maintainer-owned branches, and credit the source PR. maintainer-owned branches, and credit the source PR.
- Do not create new Linear issues until the active issue limit is cleared. - Use Linear project documents/comments for project-level updates because
project status updates are disabled in this workspace; create or update
issues when a lane needs a durable execution owner.
## Prompt-To-Artifact Execution Checklist ## Prompt-To-Artifact Execution Checklist
@@ -750,12 +762,12 @@ is not complete unless the evidence column exists and has been freshly verified.
| Prompt requirement | Required artifact or gate | Current evidence | Status | | Prompt requirement | Required artifact or gate | Current evidence | Status |
| --- | --- | --- | --- | | --- | --- | --- | --- |
| Keep public PRs below 20 | Repo-family PR recheck | 0 open PRs across `ECC`, AgentShield, JARVIS, `ECC-Tools/ECC-Tools`, and `ECC-Tools/ECC-website` on 2026-05-19 after merging PR #2004 and refreshing platform audit evidence | Complete | | Keep public PRs below 20 | Repo-family PR recheck | 0 open PRs across `ECC`, AgentShield, JARVIS, `ECC-Tools/ECC-Tools`, and `ECC-Tools/ECC-website` on the late 2026-05-19 platform audit after merging ECC PR #2013, ECC-Tools PR #79, JARVIS PR #15, and JARVIS PR #16 | Complete |
| Keep public issues below 20 | Repo-family issue recheck | 0 open issues across `ECC`, AgentShield, JARVIS, `ECC-Tools/ECC-Tools`, and `ECC-Tools/ECC-website` on 2026-05-19 after the live platform audit refresh | Complete | | Keep public issues below 20 | Repo-family issue recheck | 0 open issues across `ECC`, AgentShield, JARVIS, `ECC-Tools/ECC-Tools`, and `ECC-Tools/ECC-website` on 2026-05-19 after the live platform audit refresh | Complete |
| Manage repository discussions | Repo-family discussion recheck plus response playbook | Platform audit reports 0 discussion maintainer-touch gaps and 0 answerable Q&A missing accepted answers; trunk has 59 total discussions after #2003 was routed with a maintainer response; `docs/architecture/discussion-response-playbook.md` distinguishes support, maintainer coordination, stale/concluded, release, informational, and security-sensitive response paths | Complete | | Manage repository discussions | Repo-family discussion recheck plus response playbook | Platform audit reports 0 discussion maintainer-touch gaps and 0 answerable Q&A missing accepted answers; trunk has 59 total discussions after #2003 was routed with a maintainer response; `docs/architecture/discussion-response-playbook.md` distinguishes support, maintainer coordination, stale/concluded, release, informational, and security-sensitive response paths | Complete |
| Manage PR discussions | PR review/comment closure plus merge/close state | ECC #1990-#2011 merged through the harness audit, canonical identity, release video suite, growth outreach, evidence refresh, visual QA, suite-count, owner-approval packet, owner-approval dashboard gate, Linear readiness evidence, supply-chain evidence gate, per-project Claude Code adapter, continuous-learning project-registry hygiene, and GateGuard quoted git introspection batch; no open tracked PRs remain | Complete | | Manage PR discussions | PR review/comment closure plus merge/close state | ECC #1990-#2013 merged through the harness audit, canonical identity, release video suite, growth outreach, evidence refresh, visual QA, suite-count, owner-approval packet, owner-approval dashboard gate, Linear readiness evidence, supply-chain evidence gate, per-project Claude Code adapter, continuous-learning project-registry hygiene, GateGuard quoted git introspection, and deterministic release-approval gate batch; ECC-Tools #79 and JARVIS #15/#16 also merged; no open tracked PRs remain | Complete |
| Salvage useful stale work | `docs/stale-pr-salvage-ledger.md` plus `docs/legacy-artifact-inventory.md` | Ledger records salvaged, superseded, skipped, and manual-review tails; #1815-#1818 added cost tracking, skill scout, frontend design guidance, code-reviewer false-positive guardrails, and the May 12 gap pass; #1687, #1609, #1563, #1564, and #1565 localization tails are attached to Linear ITO-55 for language-owner review and no automatic import remains release-blocking | Complete; repeat legacy scan before release | | Salvage useful stale work | `docs/stale-pr-salvage-ledger.md` plus `docs/legacy-artifact-inventory.md` | Ledger records salvaged, superseded, skipped, and manual-review tails; #1815-#1818 added cost tracking, skill scout, frontend design guidance, code-reviewer false-positive guardrails, and the May 12 gap pass; #1687, #1609, #1563, #1564, and #1565 localization tails are attached to Linear ITO-55 for language-owner review and no automatic import remains release-blocking | Complete; repeat legacy scan before release |
| ECC 2.0 preview pack ready | Release docs, quickstart, publication readiness, release notes | `docs/releases/2.0.0-rc.1/` and readiness docs are in-tree; May 19 evidence records queue-zero state, canonical ECC identity, release video suite, growth outreach pack, owner approval packet, local 2560-test suite, PR #2001 merge and GitHub Actions run `26102500291`, PR #2002 owner-approval dashboard gate refresh and GitHub Actions run `26103853507`, PR #2004 Linear readiness evidence sync and GitHub Actions run `26105012698`, PR #2008 supply-chain evidence gate CI run `26108473648`, post-PR #2006 main CI run `26109953093`, PR #2009 project-registry hygiene GitHub Actions run `26111313938`, post-PR #2009 main CI run `26111946778`, post-PR #2011 GateGuard main CI run `26113695068`, May 19 operator dashboard, `owner-approval-packet-2026-05-19.md`, `release-approval-gate.js`, and preview-pack smoke digest `531328aaaa53` | Needs final release approval | | ECC 2.0 preview pack ready | Release docs, quickstart, publication readiness, release notes | `docs/releases/2.0.0-rc.1/` and readiness docs are in-tree; May 19 evidence records queue-zero state, canonical ECC identity, release video suite, growth outreach pack, owner approval packet, local 2568-test suite, PR #2001 merge and GitHub Actions run `26102500291`, PR #2002 owner-approval dashboard gate refresh and GitHub Actions run `26103853507`, PR #2004 Linear readiness evidence sync and GitHub Actions run `26105012698`, PR #2008 supply-chain evidence gate CI run `26108473648`, post-PR #2006 main CI run `26109953093`, PR #2009 project-registry hygiene GitHub Actions run `26111313938`, post-PR #2009 main CI run `26111946778`, post-PR #2011 GateGuard main CI run `26113695068`, post-PR #2013 release-approval main CI run `26128749863`, May 19 operator dashboard, `owner-approval-packet-2026-05-19.md`, `release-approval-gate.js`, and preview-pack smoke digest `531328aaaa53` | Needs final release approval |
| Hermes specialized skills included safely | Hermes setup/import docs and sanitized skill surface | Hermes setup and import playbook are public; secrets stay local | Needs final release review | | Hermes specialized skills included safely | Hermes setup/import docs and sanitized skill surface | Hermes setup and import playbook are public; secrets stay local | Needs final release review |
| Naming and rename readiness | Naming matrix across package/plugin/docs/social surfaces | `docs/releases/2.0.0-rc.1/naming-and-publication-matrix.md` records current package, repo, Claude plugin, Codex plugin, OpenCode, and npm availability evidence | Complete for rc.1; post-rc rename remains future work | | Naming and rename readiness | Naming matrix across package/plugin/docs/social surfaces | `docs/releases/2.0.0-rc.1/naming-and-publication-matrix.md` records current package, repo, Claude plugin, Codex plugin, OpenCode, and npm availability evidence | Complete for rc.1; post-rc rename remains future work |
| Claude and Codex plugin publication | Contact/submission path with required artifacts and status | Publication readiness, naming matrix, and May 12 dry-run evidence document plugin validation, clean-checkout Claude tag/install smoke, and Codex marketplace CLI shape | Needs explicit approval for real tag/push and marketplace submission | | Claude and Codex plugin publication | Contact/submission path with required artifacts and status | Publication readiness, naming matrix, and May 12 dry-run evidence document plugin validation, clean-checkout Claude tag/install smoke, and Codex marketplace CLI shape | Needs explicit approval for real tag/push and marketplace submission |
@@ -764,9 +776,9 @@ is not complete unless the evidence column exists and has been freshly verified.
| ECC Tools next-level app | Billing audit, PR checks, deep analyzer, sync backlog, evaluator/RAG corpus, analysis-depth readiness, hosted execution planning, hosted CI diagnostics, hosted security evidence review, hosted harness compatibility audit, hosted reference-set evaluation, hosted AI routing/cost review, hosted team backlog routing, hosted depth-plan check-run, PR-comment hosted job dispatch, hosted job result history/check-runs, hosted result status command, status-aware depth-plan recommendations, hosted promotion readiness, hosted promotion output scoring, hosted promotion retrieval planning, hosted promotion judge contract, gated hosted promotion judge execution, hosted promotion judge audit trace, payment-announcement readiness, billing announcement preflight, aggregate production billing KV readback, Marketplace webhook provenance, target-account billing readback, Marketplace-source provenance counts, AgentShield fleet-summary hosted routing, hosted finding evidence paths, harness-route policy linking, policy-promotion Action-output hosted telemetry, and operator-visible promotion output values | PRs #26-#43 plus #53-#78 landed with test evidence, including AgentShield evidence-pack gap routing, canonical bundle recognition, supply-chain signature gates, PR draft follow-up Linear tracking, evidence-backed/deep-ready repository classification, the `/api/analysis/depth-plan` hosted job plan, `/api/analysis/jobs/ci-diagnostics`, `/api/analysis/jobs/security-evidence-review`, `/api/analysis/jobs/harness-compatibility-audit`, `/api/analysis/jobs/reference-set-evaluation`, `/api/analysis/jobs/ai-routing-cost-review`, `/api/analysis/jobs/team-backlog-routing`, the `ECC Tools / Hosted Depth Plan` check-run, `/ecc-tools analyze --job ...` PR-comment dispatch, non-blocking per-hosted-job result check-runs backed by 30-day result cache records, `/ecc-tools analyze --job status` cache lookup, cache-aware next-job recommendations in the depth-plan check-run, the `ECC Tools / Hosted Promotion Readiness` corpus-backed PR check-run, deterministic hosted-output scoring against cached completed job artifacts/findings, ranked retrieval/model-prompt planning, the fail-closed `hosted-promotion-judge.v1` request contract, opt-in live model-judge execution behind hosted evidence, entitlement, budget, provider, executor, strict JSON, and citation gates, hosted promotion judge request fingerprints plus allowed-citation audit trails, a fail-closed `/api/billing/readiness` `announcementGate` for native GitHub payments claims, `npm run billing:announcement-gate` plus `--preflight` as the non-secret operator verifier, hosted security findings for AgentShield fleet summaries, an `Evidence` column in hosted finding comments/check-runs, hosted harness findings that route AgentShield fleet target paths to harness owners, ECC-Tools commit `8658951` routing AgentShield policy-promotion Action outputs into hosted security review and promotion-readiness scoring, ECC-Tools commit `16c537f` rendering policy-promotion status/pack/count/digest values directly in hosted security job comments/check-runs, ECC-Tools commit `05d4e82` rendering model-judge audit traces without exposing raw provider output, ECC-Tools commit `91a441b` adding the safe billing announcement preflight path, ECC-Tools commit `eb69412` recording the initial production readback state, ECC-Tools commit `95d0bec` adding `npm run billing:kv-readback` with aggregate account-billing and billing-state records but 0 Marketplace Pro billing-state records, ECC-Tools commit `2859678` requiring webhook-derived Marketplace provenance before announcement readiness, ECC-Tools commit `42653f9` adding Wrangler OAuth readback, ECC-Tools commit `632e059` adding sanitized target-account readback that requires both target key families before `--require-ready` can pass, and ECC-Tools commit `d5f60db` adding sanitized Marketplace plan/action provenance counts; the latest 2026-05-18 live Wrangler OAuth recheck found 256 account-billing records, 256 billing-state records, 197 Marketplace-source records, 4 Marketplace webhook-provenance records, all `Open Source`, and 0 Marketplace Pro records, then updated Linear ITO-61 with the data/provisioning blocker | Next work is create or verify Marketplace-managed Pro target billing-state with webhook provenance, configure target account plus `INTERNAL_API_SECRET`, then run `billing:kv-readback -- --wrangler --wrangler-bin ./node_modules/.bin/wrangler --account <github-login> --require-ready`, followed by the live announcement gate | | ECC Tools next-level app | Billing audit, PR checks, deep analyzer, sync backlog, evaluator/RAG corpus, analysis-depth readiness, hosted execution planning, hosted CI diagnostics, hosted security evidence review, hosted harness compatibility audit, hosted reference-set evaluation, hosted AI routing/cost review, hosted team backlog routing, hosted depth-plan check-run, PR-comment hosted job dispatch, hosted job result history/check-runs, hosted result status command, status-aware depth-plan recommendations, hosted promotion readiness, hosted promotion output scoring, hosted promotion retrieval planning, hosted promotion judge contract, gated hosted promotion judge execution, hosted promotion judge audit trace, payment-announcement readiness, billing announcement preflight, aggregate production billing KV readback, Marketplace webhook provenance, target-account billing readback, Marketplace-source provenance counts, AgentShield fleet-summary hosted routing, hosted finding evidence paths, harness-route policy linking, policy-promotion Action-output hosted telemetry, and operator-visible promotion output values | PRs #26-#43 plus #53-#78 landed with test evidence, including AgentShield evidence-pack gap routing, canonical bundle recognition, supply-chain signature gates, PR draft follow-up Linear tracking, evidence-backed/deep-ready repository classification, the `/api/analysis/depth-plan` hosted job plan, `/api/analysis/jobs/ci-diagnostics`, `/api/analysis/jobs/security-evidence-review`, `/api/analysis/jobs/harness-compatibility-audit`, `/api/analysis/jobs/reference-set-evaluation`, `/api/analysis/jobs/ai-routing-cost-review`, `/api/analysis/jobs/team-backlog-routing`, the `ECC Tools / Hosted Depth Plan` check-run, `/ecc-tools analyze --job ...` PR-comment dispatch, non-blocking per-hosted-job result check-runs backed by 30-day result cache records, `/ecc-tools analyze --job status` cache lookup, cache-aware next-job recommendations in the depth-plan check-run, the `ECC Tools / Hosted Promotion Readiness` corpus-backed PR check-run, deterministic hosted-output scoring against cached completed job artifacts/findings, ranked retrieval/model-prompt planning, the fail-closed `hosted-promotion-judge.v1` request contract, opt-in live model-judge execution behind hosted evidence, entitlement, budget, provider, executor, strict JSON, and citation gates, hosted promotion judge request fingerprints plus allowed-citation audit trails, a fail-closed `/api/billing/readiness` `announcementGate` for native GitHub payments claims, `npm run billing:announcement-gate` plus `--preflight` as the non-secret operator verifier, hosted security findings for AgentShield fleet summaries, an `Evidence` column in hosted finding comments/check-runs, hosted harness findings that route AgentShield fleet target paths to harness owners, ECC-Tools commit `8658951` routing AgentShield policy-promotion Action outputs into hosted security review and promotion-readiness scoring, ECC-Tools commit `16c537f` rendering policy-promotion status/pack/count/digest values directly in hosted security job comments/check-runs, ECC-Tools commit `05d4e82` rendering model-judge audit traces without exposing raw provider output, ECC-Tools commit `91a441b` adding the safe billing announcement preflight path, ECC-Tools commit `eb69412` recording the initial production readback state, ECC-Tools commit `95d0bec` adding `npm run billing:kv-readback` with aggregate account-billing and billing-state records but 0 Marketplace Pro billing-state records, ECC-Tools commit `2859678` requiring webhook-derived Marketplace provenance before announcement readiness, ECC-Tools commit `42653f9` adding Wrangler OAuth readback, ECC-Tools commit `632e059` adding sanitized target-account readback that requires both target key families before `--require-ready` can pass, and ECC-Tools commit `d5f60db` adding sanitized Marketplace plan/action provenance counts; the latest 2026-05-18 live Wrangler OAuth recheck found 256 account-billing records, 256 billing-state records, 197 Marketplace-source records, 4 Marketplace webhook-provenance records, all `Open Source`, and 0 Marketplace Pro records, then updated Linear ITO-61 with the data/provisioning blocker | Next work is create or verify Marketplace-managed Pro target billing-state with webhook provenance, configure target account plus `INTERNAL_API_SECRET`, then run `billing:kv-readback -- --wrangler --wrangler-bin ./node_modules/.bin/wrangler --account <github-login> --require-ready`, followed by the live announcement gate |
| GitGuardian/Dependabot/CodeRabbit-style checks | Non-blocking taxonomy, deterministic follow-up checks, and local supply-chain gates | ECC-Tools risk taxonomy check plus follow-up signals landed, including Skill Quality, Deep Analyzer Evidence, Analyzer Corpus Evidence, RAG/Evaluator Evidence, PR Review/Salvage Evidence, and AgentShield evidence-pack evidence; #1846 added npm registry signature gates; #1848 added the supply-chain incident-response playbook and `pull_request_target` cache-poisoning validator guard; #1851 added the privileged checkout credential-persistence guard; AgentShield #78, JARVIS #13, and ECC-Tools #53 applied the same hardening outside trunk | Current supply-chain gate complete; deeper hosted review features remain future | | GitGuardian/Dependabot/CodeRabbit-style checks | Non-blocking taxonomy, deterministic follow-up checks, and local supply-chain gates | ECC-Tools risk taxonomy check plus follow-up signals landed, including Skill Quality, Deep Analyzer Evidence, Analyzer Corpus Evidence, RAG/Evaluator Evidence, PR Review/Salvage Evidence, and AgentShield evidence-pack evidence; #1846 added npm registry signature gates; #1848 added the supply-chain incident-response playbook and `pull_request_target` cache-poisoning validator guard; #1851 added the privileged checkout credential-persistence guard; AgentShield #78, JARVIS #13, and ECC-Tools #53 applied the same hardening outside trunk | Current supply-chain gate complete; deeper hosted review features remain future |
| Harness-agnostic learning system | Audit, adapter matrix, observability, traces, promotion loop | Audit/adapters/observability gates plus `docs/architecture/evaluator-rag-prototype.md`, `examples/evaluator-rag-prototype/`, and ECC-Tools PR #40 define read-only stale-salvage, billing-readiness, CI-failure-diagnosis, harness-config-quality, AgentShield policy-exception, skill-quality evidence, deep-analyzer evidence, and RAG/evaluator comparison scenarios with trace, report, playbook, verifier, and predictive-check artifacts; ECC-Tools PRs #68-#72 now turn that corpus into a deterministic PR check-run gate with cached hosted-output scoring, ranked retrieval candidates, a model prompt seed, a fail-closed hosted model-judge request contract, and opt-in live model execution behind strict hosted-evidence gates | Deterministic hosted PR check, cached output scoring, retrieval planning, judge contract, and gated model execution integrated | | Harness-agnostic learning system | Audit, adapter matrix, observability, traces, promotion loop | Audit/adapters/observability gates plus `docs/architecture/evaluator-rag-prototype.md`, `examples/evaluator-rag-prototype/`, and ECC-Tools PR #40 define read-only stale-salvage, billing-readiness, CI-failure-diagnosis, harness-config-quality, AgentShield policy-exception, skill-quality evidence, deep-analyzer evidence, and RAG/evaluator comparison scenarios with trace, report, playbook, verifier, and predictive-check artifacts; ECC-Tools PRs #68-#72 now turn that corpus into a deterministic PR check-run gate with cached hosted-output scoring, ranked retrieval candidates, a model prompt seed, a fail-closed hosted model-judge request contract, and opt-in live model execution behind strict hosted-evidence gates | Deterministic hosted PR check, cached output scoring, retrieval planning, judge contract, and gated model execution integrated |
| Linear roadmap is detailed | Linear project status plus repo mirror | Repo mirror exists and issue creation works again; the May 19 sync adds post-PR #2002 document `ecc-may-19-post-pr-2002-sync-64cef8f668e0`, project comment `a6411e3a-8c8e-4a58-adba-687e77d4c543`, ITO-44/47/48/49/51/54/56 issue comments, and In Progress state for ITO-47, ITO-48, ITO-49, ITO-51, ITO-54, and ITO-56; PR #2004 mirrors that sync into the repo evidence set | Needs recurring status updates after each significant merge batch | | Linear roadmap is detailed | Linear project document/comments plus repo mirror | Repo mirror exists and issue creation works again; the May 19 sync adds post-PR #2002 document `ecc-may-19-post-pr-2002-sync-64cef8f668e0`, project comment `a6411e3a-8c8e-4a58-adba-687e77d4c543`, ITO-44/47/48/49/51/54/56 issue comments, and In Progress state for ITO-47, ITO-48, ITO-49, ITO-51, ITO-54, and ITO-56; the late-pass batch adds document `ecc-may-19-late-queue-zero-and-release-gate-sync-1c26f65e6b3f`, project comment `d42bf0e2-7a8e-4934-9f3f-e281498ee805`, and ITO-44/50/54/56/61 comments for PR #2013, ECC-Tools #79, and JARVIS #15/#16 because project status updates are disabled in the workspace | Needs recurring document/comment updates after each significant merge batch |
| Flow separation and progress tracking | Flow lanes with owner artifacts and update cadence | This roadmap defines lanes below and `docs/architecture/progress-sync-contract.md` makes GitHub/Linear/handoff/roadmap sync part of the readiness gate | Active | | Flow separation and progress tracking | Flow lanes with owner artifacts and update cadence | This roadmap defines lanes below and `docs/architecture/progress-sync-contract.md` makes GitHub/Linear/handoff/roadmap sync part of the readiness gate | Active |
| Realtime Linear sync | Project comments while issue/status capacity is blocked; issues later | ECC-Tools #39 implements opt-in Linear API sync for deferred follow-up backlog items, and ECC-Tools #54 adds copy-ready PR drafts to that backlog when draft PR shells are not opened; `docs/architecture/progress-sync-contract.md` defines the local file-backed realtime boundary while issue capacity is blocked; May 18 live connector comments were posted to ITO-57 and the ECC platform project after project status updates returned disabled | Needs workspace capacity/config rollout for productized issue sync | | Realtime Linear sync | Project documents/comments plus issue comments for lane updates | ECC-Tools #39 implements opt-in Linear API sync for deferred follow-up backlog items, and ECC-Tools #54 adds copy-ready PR drafts to that backlog when draft PR shells are not opened; `docs/architecture/progress-sync-contract.md` defines the local file-backed realtime boundary; May 18 and May 19 live connector comments were posted to the ECC platform project and lane issues after project status updates returned disabled | Needs workspace config/product rollout for hosted issue sync |
| Observability for self-use | Local readiness gate, traces, status snapshots, HUD/status contract, risk ledger, progress-sync contract | `npm run observability:ready` reports 21/21 | Complete for local gate | | Observability for self-use | Local readiness gate, traces, status snapshots, HUD/status contract, risk ledger, progress-sync contract | `npm run observability:ready` reports 21/21 | Complete for local gate |
| Proper release and notifications | Release tag, npm publish state, plugin state, social posts | Publication readiness gate exists with May 12 dry-run and May 13 readiness evidence | Not complete; approval/live URLs required | | Proper release and notifications | Release tag, npm publish state, plugin state, social posts | Publication readiness gate exists with May 12 dry-run and May 13 readiness evidence | Not complete; approval/live URLs required |
@@ -845,7 +857,7 @@ Acceptance:
Zed-adjacent surfaces, dmux, Orca, Superset, Ghast, and terminal-only use. Zed-adjacent surfaces, dmux, Orca, Superset, Ghast, and terminal-only use.
- Each adapter has supported assets, unsupported surfaces, install path, - Each adapter has supported assets, unsupported surfaces, install path,
verification command, and risk notes. verification command, and risk notes.
- Harness audit remains 70/70 and gains a public onramp that explains how teams - Harness audit remains 80/80 and gains a public onramp that explains how teams
use the scorecard. use the scorecard.
- Reference findings are converted into concrete adapter, observability, or - Reference findings are converted into concrete adapter, observability, or
operator-surface deltas. operator-surface deltas.

View File

@@ -9,7 +9,7 @@ status update can claim a lane is current.
| Surface | Role | Current rule | | Surface | Role | Current rule |
| --- | --- | --- | | --- | --- | --- |
| GitHub PRs/issues/discussions | Public queue and review state | Recheck live counts before every significant merge batch and before release approval. | | GitHub PRs/issues/discussions | Public queue and review state | Recheck live counts before every significant merge batch and before release approval. |
| Linear project | Executive roadmap and stakeholder status update | Post project status updates while issue capacity blocks issue creation. Create/reuse issues only when workspace capacity is available. | | Linear project | Executive roadmap and stakeholder status update | Use project documents and project/issue comments because project status updates are disabled in this workspace; create/reuse issues for durable execution lanes. |
| Local handoff | Durable operator continuity | Update the active handoff after every merge batch, queue drain, skipped release gate, or blocked external action. | | Local handoff | Durable operator continuity | Update the active handoff after every merge batch, queue drain, skipped release gate, or blocked external action. |
| Repo roadmap | Auditable planning mirror | Keep `docs/ECC-2.0-GA-ROADMAP.md` aligned to merged PR evidence and unresolved gates. | | Repo roadmap | Auditable planning mirror | Keep `docs/ECC-2.0-GA-ROADMAP.md` aligned to merged PR evidence and unresolved gates. |
| `scripts/work-items.js` | Local tracker bridge | Sync GitHub PRs/issues into the SQLite work-items store for status snapshots and blocked follow-up. | | `scripts/work-items.js` | Local tracker bridge | Sync GitHub PRs/issues into the SQLite work-items store for status snapshots and blocked follow-up. |
@@ -41,9 +41,12 @@ After a significant merge batch, update Linear and the handoff with:
4. Deferred or skipped work and the explicit reason. 4. Deferred or skipped work and the explicit reason.
5. The next one or two implementation slices. 5. The next one or two implementation slices.
When Linear issue capacity is unavailable, use a project status update instead When Linear project status updates are unavailable, use a project document plus
of creating placeholder issues. When issue capacity is available, create or project/issue comments instead of creating placeholder issues. Issue capacity is
reuse exact-title issues and link them to the repo evidence. available for durable execution lanes, but do not use that issue capacity as a
substitute for evidence-backed project status. Create or reuse exact-title
issues only when the lane needs a durable execution owner, and link those issues
to repo evidence.
## Realtime Boundary ## Realtime Boundary

View File

@@ -8,7 +8,7 @@ release action after the final evidence commands are rerun from the intended
release commit. release commit.
Source commit for the clean evidence baseline this packet extends: Source commit for the clean evidence baseline this packet extends:
`14d88e517b0c56a80c1a6392b1cde2474948d29f`. `9819626459a662773be7d0b1c18d82c1316b8c36`.
## Current Evidence ## Current Evidence
@@ -19,8 +19,8 @@ Source commit for the clean evidence baseline this packet extends:
| Release approval gate | ready false, digest `ef8f49f727b7`, 4/6 checks pass; owner decisions and live URL readbacks pending | yes | | Release approval gate | ready false, digest `ef8f49f727b7`, 4/6 checks pass; owner decisions and live URL readbacks pending | yes |
| Video suite | ready true, 15/15 source assets, 13/13 suite artifacts, 12/12 publish candidates | yes | | Video suite | ready true, 15/15 source assets, 13/13 suite artifacts, 12/12 publish candidates | yes |
| Release surface tests | 27/27 passed after this packet was added | yes | | Release surface tests | 27/27 passed after this packet was added | yes |
| Full local suite | 2560/2560 passed after PR #2011 was prepared; focused GateGuard regression passed 91/91 again on current `main` | yes | | Full local suite | 2568/2568 passed before PR #2013 merged; focused GateGuard regression passed 91/91 again before PR #2011 merged | yes |
| GitHub CI | PR #1998, PR #1999, PR #2000, PR #2001, PR #2002, PR #2004, PR #2008, post-PR #2006 `main`, PR #2009, post-PR #2009 `main`, and post-PR #2011 `main` all merged or advanced after green required checks | verify current head | | GitHub CI | PR #1998, PR #1999, PR #2000, PR #2001, PR #2002, PR #2004, PR #2008, post-PR #2006 `main`, PR #2009, post-PR #2009 `main`, post-PR #2011 `main`, and post-PR #2013 `main` all merged or advanced after green required checks | verify current head |
## Decision Register ## Decision Register

View File

@@ -26,7 +26,7 @@ surfaces, or posting announcements.
| `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-16.md` | Current May 16/17 queue cleanup, recsys skill merge, GateGuard triage, PR #1947 supply-chain protection, AgentShield #87 plugin-cache confidence evidence, AgentShield #88 evidence-pack inspect/readback, AgentShield #89 evidence-pack fleet routing, AgentShield #90 fleet review items, AgentShield #91 policy export, AgentShield #92 policy promotion, ECC-Tools #76 fleet-summary consumption, ECC-Tools #77 hosted finding evidence paths, ECC-Tools #78 harness policy-route linking, dashboard refresh, and combined Node/Rust/release-surface gate evidence through the May 16 mirror | Must still be repeated from a strict clean checkout before real publication | | `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-16.md` | Current May 16/17 queue cleanup, recsys skill merge, GateGuard triage, PR #1947 supply-chain protection, AgentShield #87 plugin-cache confidence evidence, AgentShield #88 evidence-pack inspect/readback, AgentShield #89 evidence-pack fleet routing, AgentShield #90 fleet review items, AgentShield #91 policy export, AgentShield #92 policy promotion, ECC-Tools #76 fleet-summary consumption, ECC-Tools #77 hosted finding evidence paths, ECC-Tools #78 harness policy-route linking, dashboard refresh, and combined Node/Rust/release-surface gate evidence through the May 16 mirror | Must still be repeated from a strict clean checkout before real publication |
| `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-17.md` | May 17 queue-zero state, Japanese localization merge, Dependabot TypeScript and Node type merges, post-merge ja-JP lint repair, Mini Shai-Hulud/TanStack protection recheck, npm audit/signature checks, legacy and Linear progress routing, deterministic preview-pack smoke, operator dashboard refresh, Linear sync, and GitHub CI evidence for `27dc2918` | Superseded by the May 18 evidence snapshot; repeat from a strict clean checkout before real publication | | `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-17.md` | May 17 queue-zero state, Japanese localization merge, Dependabot TypeScript and Node type merges, post-merge ja-JP lint repair, Mini Shai-Hulud/TanStack protection recheck, npm audit/signature checks, legacy and Linear progress routing, deterministic preview-pack smoke, operator dashboard refresh, Linear sync, and GitHub CI evidence for `27dc2918` | Superseded by the May 18 evidence snapshot; repeat from a strict clean checkout before real publication |
| `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-18.md` | May 18 queue-zero state, #1970/#1971/#1972 merge batch, #1978 review/closure, supply-chain recheck, AgentShield evidence mirror, Linear sync, current-head CI/security scan success for `4470e2e6`, and ITO-46 naming/plugin publication closure | Superseded by the May 19 ECC identity, video, and growth evidence snapshot | | `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-18.md` | May 18 queue-zero state, #1970/#1971/#1972 merge batch, #1978 review/closure, supply-chain recheck, AgentShield evidence mirror, Linear sync, current-head CI/security scan success for `4470e2e6`, and ITO-46 naming/plugin publication closure | Superseded by the May 19 ECC identity, video, and growth evidence snapshot |
| `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-19.md` | Current May 19 evidence for canonical ECC identity, release video suite, partner/sponsor/talk outreach pack, owner approval packet, release approval gate, May 19 operator dashboard, preview-pack smoke digest `531328aaaa53`, 2560-test local suite, PR #1998 visual QA CI success, PR #1999 dashboard evidence CI success, PR #2000 suite-count evidence success, PR #2001 owner approval packet CI success, PR #2002 owner-approval dashboard gate CI success, PR #2004 Linear readiness evidence sync CI success, PR #2008 supply-chain evidence gate CI success, post-PR #2006 main CI success, PR #2009 project-registry hygiene CI success, post-PR #2009 main CI success, post-PR #2011 GateGuard CI success, and the May 19 Linear sync document | Current strongest readiness snapshot; must still be repeated from a strict clean checkout before real publication | | `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-19.md` | Current May 19 evidence for canonical ECC identity, release video suite, partner/sponsor/talk outreach pack, owner approval packet, release approval gate, May 19 operator dashboard, preview-pack smoke digest `531328aaaa53`, 2568-test local suite, PR #1998 visual QA CI success, PR #1999 dashboard evidence CI success, PR #2000 suite-count evidence success, PR #2001 owner approval packet CI success, PR #2002 owner-approval dashboard gate CI success, PR #2004 Linear readiness evidence sync CI success, PR #2008 supply-chain evidence gate CI success, post-PR #2006 main CI success, PR #2009 project-registry hygiene CI success, post-PR #2009 main CI success, post-PR #2011 GateGuard CI success, post-PR #2013 release-approval-gate CI success, ECC-Tools #79 billing-announcement redaction hardening, JARVIS #15/#16 queue/deploy repair, and the May 19 Linear sync document | Current strongest readiness snapshot; must still be repeated from a strict clean checkout before real publication |
| `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-17.md` | Previous prompt-to-artifact operator dashboard | Superseded by the May 18 generated dashboard | | `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-17.md` | Previous prompt-to-artifact operator dashboard | Superseded by the May 18 generated dashboard |
| `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-18.md` | Previous prompt-to-artifact operator dashboard | Superseded by the May 19 generated dashboard | | `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-18.md` | Previous prompt-to-artifact operator dashboard | Superseded by the May 19 generated dashboard |
| `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-19.md` | Current prompt-to-artifact operator dashboard | Shows PR/issue/discussion/platform/supply-chain gates current and adds the current `$1,728/mo` to `$10,000/mo` hypergrowth, video owner-approval, and outbound-pack operating lanes | | `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-19.md` | Current prompt-to-artifact operator dashboard | Shows PR/issue/discussion/platform/supply-chain gates current and adds the current `$1,728/mo` to `$10,000/mo` hypergrowth, video owner-approval, and outbound-pack operating lanes |

View File

@@ -8,9 +8,9 @@ social announcement.
| Field | Evidence | | Field | Evidence |
| --- | --- | | --- | --- |
| Upstream main | `14d88e517b0c56a80c1a6392b1cde2474948d29f` | | Upstream main | `9819626459a662773be7d0b1c18d82c1316b8c36` |
| Git remote | `https://github.com/affaan-m/ECC.git` | | Git remote | `https://github.com/affaan-m/ECC.git` |
| Evidence scope | Current `main` after PR #1990 harness-audit GitHub integration scoring, PR #1991 canonical ECC identity gate, PR #1992 release video-suite gate, PR #1993 growth outreach pack, PR #1994 May 19 publication evidence refresh, PR #1995 operator dashboard refresh, PR #1996 primary render self-eval gate, PR #1997 publish-candidate gate, PR #1998 visual QA gate, PR #1999 video dashboard evidence refresh, PR #2000 suite-count evidence refresh, PR #2001 owner approval packet addition, PR #2002 owner approval dashboard gate refresh, PR #2004 Linear readiness evidence sync, PR #2005 post-PR #2004 evidence refresh, PR #2008 release supply-chain evidence gate fix, PR #2006 per-project Claude Code adapter, PR #2009 continuous-learning project registry hygiene fix, and PR #2011 GateGuard quoted git introspection fix | | Evidence scope | Current `main` after PR #1990 harness-audit GitHub integration scoring, PR #1991 canonical ECC identity gate, PR #1992 release video-suite gate, PR #1993 growth outreach pack, PR #1994 May 19 publication evidence refresh, PR #1995 operator dashboard refresh, PR #1996 primary render self-eval gate, PR #1997 publish-candidate gate, PR #1998 visual QA gate, PR #1999 video dashboard evidence refresh, PR #2000 suite-count evidence refresh, PR #2001 owner approval packet addition, PR #2002 owner approval dashboard gate refresh, PR #2004 Linear readiness evidence sync, PR #2005 post-PR #2004 evidence refresh, PR #2008 release supply-chain evidence gate fix, PR #2006 per-project Claude Code adapter, PR #2009 continuous-learning project registry hygiene fix, PR #2011 GateGuard quoted git introspection fix, and PR #2013 deterministic release approval gate |
| Local status caveat | `git status --short --branch` was clean after pulling `origin/main`; generated evidence files are committed after the source snapshot they describe | | Local status caveat | `git status --short --branch` was clean after pulling `origin/main`; generated evidence files are committed after the source snapshot they describe |
The release operator must repeat all publish-facing checks from the exact final The release operator must repeat all publish-facing checks from the exact final
@@ -57,6 +57,18 @@ Tracked repositories in the platform audit were:
| PR #2006 | Merged the `claude-project` install target for per-project Claude Code adapter support, then fixed the manifest schema enum on top of the feature branch before merge | | PR #2006 | Merged the `claude-project` install target for per-project Claude Code adapter support, then fixed the manifest schema enum on top of the feature branch before merge |
| PR #2009 | Merged the continuous-learning project registry hygiene fix: non-git hook payloads stay global, no-remote linked worktrees migrate to the main worktree project ID, and `instinct-cli.py projects delete`, `merge`, and `gc` provide operator maintenance commands | | PR #2009 | Merged the continuous-learning project registry hygiene fix: non-git hook payloads stay global, no-remote linked worktrees migrate to the main worktree project ID, and `instinct-cli.py projects delete`, `merge`, and `gc` provide operator maintenance commands |
| PR #2011 | Merged the GateGuard read-only git introspection tokenizer fix so quoted `git show` pathspecs with spaces are preserved while quoted shell separators stay outside the bypass | | PR #2011 | Merged the GateGuard read-only git introspection tokenizer fix so quoted `git show` pathspecs with spaces are preserved while quoted shell separators stay outside the bypass |
| PR #2013 | Merged the deterministic `release:approval-gate` so final publication, package, plugin, video, billing, social, and outbound actions remain blocked until owner decisions and live URL readbacks are complete |
## Post-Queue-Zero Sync - 2026-05-19 Late Pass
| Surface | Evidence |
| --- | --- |
| ECC approval gate | PR #2013 merged as `9819626459a662773be7d0b1c18d82c1316b8c36`; GitHub Actions run `26128749863` completed successfully; `npm run release:approval-gate -- --format json` remains intentionally blocked with digest `ef8f49f727b7`, 4/6 passing, and failures only on owner decisions plus live URL readbacks |
| ECC platform audit | `node scripts/platform-audit.js --json` at `2026-05-19T22:45:15Z` returned ready true, 0 open PRs, 0 open issues, 0 discussion maintainer-touch gaps, 0 answerable Q&A gaps, and 0 dirty blockers across `affaan-m/ECC`, `affaan-m/agentshield`, `affaan-m/JARVIS`, `ECC-Tools/ECC-Tools`, and `ECC-Tools/ECC-website` |
| ECC-Tools billing hardening | ECC-Tools PR #79 merged as `67ee247ae1b7b50ecc1261ed5d62d65cc8390da8`; preflight and live billing-announcement output now redact account login values to a stable fingerprint while preserving readiness blockers/actions; local validation passed targeted tests, full test suite 678/678, lint, typecheck, manual preflight, and `git diff --check`; post-merge main CI run `26129253509` completed successfully |
| JARVIS queue drain | JARVIS PR #15 merged the Dependabot `idna` 3.11 to 3.15 security bump as `4b3685d6ee23b4da1f1a7d22281c6b5d6c0a42c7`; PR checks and post-merge CI/CodeQL passed |
| JARVIS deploy repair | JARVIS PR #16 merged as `4369c34babd21d539c420866da51c7a8365f1c9e`; the deploy workflow no longer uses an invalid job-level `secrets.*` condition, Vercel deploy skips cleanly when secrets are absent, backend image build/push succeeds, and main CI, CodeQL, and Deploy runs `26129539376`, `26129539427`, and `26129539425` completed successfully |
| Linear roadmap sync | Linear document `ecc-may-19-late-queue-zero-and-release-gate-sync-1c26f65e6b3f`, project comment `d42bf0e2-7a8e-4934-9f3f-e281498ee805`, and issue comments on ITO-44, ITO-50, ITO-54, ITO-56, and ITO-61 record the late-pass queue-zero, release-gate, billing-safety, and progress-sync state. |
## Release And Growth Evidence ## Release And Growth Evidence
@@ -70,7 +82,8 @@ Tracked repositories in the platform audit were:
| Release video suite | `npm run release:video-suite -- --format json --summary` with `ECC_VIDEO_SOURCE_ROOT` and `ECC_VIDEO_RELEASE_SUITE_ROOT` | Ready true; 15/15 source assets present; 13/13 render, timeline, caption, EDL, and segment artifacts present; 12/12 publish-candidate outputs present with zero detected black-frame segments; primary rough render self-eval passed at 144.759 seconds, 1920x1080, 1 audio stream, and 106.78 MB | | Release video suite | `npm run release:video-suite -- --format json --summary` with `ECC_VIDEO_SOURCE_ROOT` and `ECC_VIDEO_RELEASE_SUITE_ROOT` | Ready true; 15/15 source assets present; 13/13 render, timeline, caption, EDL, and segment artifacts present; 12/12 publish-candidate outputs present with zero detected black-frame segments; primary rough render self-eval passed at 144.759 seconds, 1920x1080, 1 audio stream, and 106.78 MB |
| Focused post-merge regression set | `node tests/hooks/detect-project-worktree.test.js`; `node tests/hooks/observe-subdirectory-detection.test.js`; `node tests/scripts/instinct-cli-projects.test.js`; `node tests/hooks/hooks.test.js` | 10/10, 6/6, 5/5, and 237/237 passed after PR #2009 merged | | Focused post-merge regression set | `node tests/hooks/detect-project-worktree.test.js`; `node tests/hooks/observe-subdirectory-detection.test.js`; `node tests/scripts/instinct-cli-projects.test.js`; `node tests/hooks/hooks.test.js` | 10/10, 6/6, 5/5, and 237/237 passed after PR #2009 merged |
| GateGuard PR #2011 regression | `node tests/hooks/gateguard-fact-force.test.js`; `npm test`; `git diff --check main...HEAD` | 91/91 passed on the PR branch; full local suite passed 2560/2560 before merge; whitespace check passed; focused GateGuard suite passed again on current `main` | | GateGuard PR #2011 regression | `node tests/hooks/gateguard-fact-force.test.js`; `npm test`; `git diff --check main...HEAD` | 91/91 passed on the PR branch; full local suite passed 2560/2560 before merge; whitespace check passed; focused GateGuard suite passed again on current `main` |
| Full local suite | `node tests/run-all.js` | 2560 passed, 0 failed | | Release approval gate PR #2013 validation | `npm test`; `npm run lint`; `git diff --check`; `npm run preview-pack:smoke -- --format json`; `npm run release:approval-gate -- --format json` | 2568/2568 tests passed before merge; lint and whitespace passed; preview pack stayed ready with digest `531328aaaa53`; release approval gate returned the expected blocked exit with digest `ef8f49f727b7` |
| Full local suite | `node tests/run-all.js` | 2568 passed, 0 failed before PR #2013 merge |
| PR #1998 CI | GitHub Actions run `26099020341` | Completed successfully for `d500de1e9f11c0446b6a1349bd98b522d31f9125`; all reported checks passed, including lint, validation, security scan, coverage, GitGuardian, CodeRabbit, Cubic, and the macOS/Ubuntu/Windows test matrix | | PR #1998 CI | GitHub Actions run `26099020341` | Completed successfully for `d500de1e9f11c0446b6a1349bd98b522d31f9125`; all reported checks passed, including lint, validation, security scan, coverage, GitGuardian, CodeRabbit, Cubic, and the macOS/Ubuntu/Windows test matrix |
| PR #1999 CI | GitHub Actions run `26100148726` | Completed successfully for `90584b6d5e5814bc2ad9a4cd651bebd043de989d`; lint, validation, security scan, coverage, GitGuardian, CodeRabbit, and the macOS/Ubuntu/Windows test matrix passed; Cubic completed neutral and did not block merge | | PR #1999 CI | GitHub Actions run `26100148726` | Completed successfully for `90584b6d5e5814bc2ad9a4cd651bebd043de989d`; lint, validation, security scan, coverage, GitGuardian, CodeRabbit, and the macOS/Ubuntu/Windows test matrix passed; Cubic completed neutral and did not block merge |
| PR #2001 CI | GitHub Actions run `26102500291` | Completed successfully for `8148340ad14eb32c971346f0cb4cb9431ec0f5de`; required checks passed before merge | | PR #2001 CI | GitHub Actions run `26102500291` | Completed successfully for `8148340ad14eb32c971346f0cb4cb9431ec0f5de`; required checks passed before merge |
@@ -82,7 +95,8 @@ Tracked repositories in the platform audit were:
| PR #2009 CI | GitHub Actions run `26111313938` | Completed successfully with 37 completed jobs, 0 failed jobs after replacing the brittle fake-worktree regression fixture with a real `git worktree add` setup | | PR #2009 CI | GitHub Actions run `26111313938` | Completed successfully with 37 completed jobs, 0 failed jobs after replacing the brittle fake-worktree regression fixture with a real `git worktree add` setup |
| Post-PR #2009 main CI | GitHub Actions run `26111946778` | Completed successfully with 37 completed jobs, 0 failed jobs, and `main` advanced to `bc519e5b8ed42f26c0a5a611756e04351c323f21` | | Post-PR #2009 main CI | GitHub Actions run `26111946778` | Completed successfully with 37 completed jobs, 0 failed jobs, and `main` advanced to `bc519e5b8ed42f26c0a5a611756e04351c323f21` |
| Post-PR #2011 main CI | GitHub Actions run `26113695068` | Completed successfully with 37 completed jobs, 0 failed jobs, and `main` advanced to `14d88e517b0c56a80c1a6392b1cde2474948d29f` | | Post-PR #2011 main CI | GitHub Actions run `26113695068` | Completed successfully with 37 completed jobs, 0 failed jobs, and `main` advanced to `14d88e517b0c56a80c1a6392b1cde2474948d29f` |
| Linear sync | Linear document `ecc-may-19-post-pr-2002-sync-64cef8f668e0` plus project comment `a6411e3a-8c8e-4a58-adba-687e77d4c543` | Project and issue lanes now record PR #2002 evidence, discussion #2003 routing, owner-approval dashboard gate, and In Progress status for ITO-47, ITO-48, ITO-49, ITO-51, ITO-54, and ITO-56 | | Post-PR #2013 main CI | GitHub Actions run `26128749863` | Completed successfully with `main` advanced to `9819626459a662773be7d0b1c18d82c1316b8c36` |
| Linear sync | Linear document `ecc-may-19-post-pr-2002-sync-64cef8f668e0` plus project comment `a6411e3a-8c8e-4a58-adba-687e77d4c543`; late-pass document `ecc-may-19-late-queue-zero-and-release-gate-sync-1c26f65e6b3f` plus project comment `d42bf0e2-7a8e-4934-9f3f-e281498ee805` | Project and issue lanes record PR #2002 evidence, discussion #2003 routing, owner-approval dashboard gate, and In Progress status for ITO-47, ITO-48, ITO-49, ITO-51, ITO-54, and ITO-56; the late-pass sync attaches PR #2013, ECC-Tools #79, and JARVIS #15/#16 evidence to ITO-44, ITO-50, ITO-54, ITO-56, and ITO-61 |
| Public-path sanitization | `node scripts/ci/validate-no-personal-paths.js` through local suite and CI | Passed | | Public-path sanitization | `node scripts/ci/validate-no-personal-paths.js` through local suite and CI | Passed |
| Markdown and whitespace | `markdownlint` focused release docs plus `git diff --check` before PR #1999 | Passed | | Markdown and whitespace | `markdownlint` focused release docs plus `git diff --check` before PR #1999 | Passed |
@@ -97,7 +111,7 @@ Tracked repositories in the platform audit were:
| Owner approval proof | `owner-approval-packet-2026-05-19.md` centralizes release, package, plugin, video, billing, social, and outbound decision gates | | Owner approval proof | `owner-approval-packet-2026-05-19.md` centralizes release, package, plugin, video, billing, social, and outbound decision gates |
| Business baseline | Hypergrowth command center and partner pack use `$1,728/mo` current MRR, `$10,000/mo` target MRR, and `$8,272/mo` gap | | Business baseline | Hypergrowth command center and partner pack use `$1,728/mo` current MRR, `$10,000/mo` target MRR, and `$8,272/mo` gap |
| Operator dashboard | `operator-readiness-dashboard-2026-05-19.md` pulls the growth baseline into the same queue, publication, video, outbound, AgentShield, ECC Tools, Linear, and supply-chain control surface | | Operator dashboard | `operator-readiness-dashboard-2026-05-19.md` pulls the growth baseline into the same queue, publication, video, outbound, AgentShield, ECC Tools, Linear, and supply-chain control surface |
| Linear progress proof | Linear project document `ecc-may-19-post-pr-2002-sync-64cef8f668e0` mirrors the post-PR #2002 state and records active lanes for launch materials, AgentShield, ECC Tools deep analysis, observability, and final release publication | | Linear progress proof | Linear project document `ecc-may-19-post-pr-2002-sync-64cef8f668e0` mirrors the post-PR #2002 state and records active lanes for launch materials, AgentShield, ECC Tools deep analysis, observability, and final release publication; Linear document `ecc-may-19-late-queue-zero-and-release-gate-sync-1c26f65e6b3f` adds the PR #2013 approval gate, ECC-Tools #79 redaction hardening, and JARVIS #15/#16 queue/deploy repair evidence |
## Current Publication Blockers ## Current Publication Blockers
@@ -122,10 +136,12 @@ Tracked repositories in the platform audit were:
The tracked public PR queue, issue queue, discussion queue, canonical ECC The tracked public PR queue, issue queue, discussion queue, canonical ECC
identity, release video suite, preview pack, growth outreach packet, per-project identity, release video suite, preview pack, growth outreach packet, per-project
Claude Code adapter surface, continuous-learning project registry hygiene, and Claude Code adapter surface, continuous-learning project registry hygiene,
GateGuard quoted git introspection fix are current on May 19, 2026 for `main` GateGuard quoted git introspection fix, deterministic release approval gate,
through `14d88e517b0c56a80c1a6392b1cde2474948d29f`. The remaining video work is ECC-Tools billing-announcement redaction hardening, and JARVIS security/deploy
owner approval, upload, and public URL attachment, not render or QA production. queue repairs are current on May 19, 2026 for `main` through
`9819626459a662773be7d0b1c18d82c1316b8c36`. The remaining video work is owner
approval, upload, and public URL attachment, not render or QA production.
This improves publication readiness but does not replace the approval-gated This improves publication readiness but does not replace the approval-gated
release, package, plugin, billing, Discord, and announcement steps in release, package, plugin, billing, Discord, and announcement steps in

View File

@@ -109,7 +109,7 @@ Record the exact commit SHA and command output before any publication action:
| Observability readiness | `npm run observability:ready` | 21/21 passing | Current release gate: 21/21, ready true | | Observability readiness | `npm run observability:ready` | 21/21 passing | Current release gate: 21/21, ready true |
| Release safety gate | `npm run observability:ready -- --format json` | Release Safety category passing with publication readiness, supply-chain, workflow security, package surface, and release-surface evidence | Current release gate keeps Release Safety passing at 3/3; repeat the JSON gate from the exact final release commit | | Release safety gate | `npm run observability:ready -- --format json` | Release Safety category passing with publication readiness, supply-chain, workflow security, package surface, and release-surface evidence | Current release gate keeps Release Safety passing at 3/3; repeat the JSON gate from the exact final release commit |
| Supply-chain verification | `npm audit --audit-level=moderate`; `npm audit signatures`; `yarn install --immutable --mode=skip-build`; `cd ecc2 && cargo audit -q`; Dependabot alerts; GitGuardian Security Checks | 0 vulnerabilities/alerts, registry signatures verified, package-manager locks accepted, GitGuardian clean | Current supply-chain branch: `npm audit` found 0 vulnerabilities; `npm audit signatures` verified 254 registry signatures and 30 attestations; Yarn immutable install accepted the lock after pinning `@types/node@25.7.0` and moving `brace-expansion` to `5.0.6` / `1.1.14`; PR #2008 CI `26108473648`, post-PR #2006 main CI `26109953093`, PR #2009 CI `26111313938`, and post-PR #2009 main CI `26111946778` completed with 0 failures | | Supply-chain verification | `npm audit --audit-level=moderate`; `npm audit signatures`; `yarn install --immutable --mode=skip-build`; `cd ecc2 && cargo audit -q`; Dependabot alerts; GitGuardian Security Checks | 0 vulnerabilities/alerts, registry signatures verified, package-manager locks accepted, GitGuardian clean | Current supply-chain branch: `npm audit` found 0 vulnerabilities; `npm audit signatures` verified 254 registry signatures and 30 attestations; Yarn immutable install accepted the lock after pinning `@types/node@25.7.0` and moving `brace-expansion` to `5.0.6` / `1.1.14`; PR #2008 CI `26108473648`, post-PR #2006 main CI `26109953093`, PR #2009 CI `26111313938`, and post-PR #2009 main CI `26111946778` completed with 0 failures |
| Root suite | `node tests/run-all.js` | 0 failures | Current May 19 local suite: 2560 passed, 0 failed; post-PR #2009 focused regressions also passed for worktree detection, observe subdirectory/global fallback, project maintenance CLI, and the hooks suite | | Root suite | `node tests/run-all.js` | 0 failures | Current May 19 local suite: 2568 passed, 0 failed before PR #2013 merged; post-PR #2009 focused regressions also passed for worktree detection, observe subdirectory/global fallback, project maintenance CLI, and the hooks suite |
| Markdown lint | `npx markdownlint-cli '**/*.md' --ignore node_modules` | 0 failures | Current release gate: focused lint passed for `publication-readiness.md`, `publication-evidence-2026-05-19.md`, and `docs/ECC-2.0-GA-ROADMAP.md` | | Markdown lint | `npx markdownlint-cli '**/*.md' --ignore node_modules` | 0 failures | Current release gate: focused lint passed for `publication-readiness.md`, `publication-evidence-2026-05-19.md`, and `docs/ECC-2.0-GA-ROADMAP.md` |
| Package surface | `node tests/scripts/npm-publish-surface.test.js` | 0 failures; no Python bytecode in npm tarball | Current release gate: 2/2 passed | | Package surface | `node tests/scripts/npm-publish-surface.test.js` | 0 failures; no Python bytecode in npm tarball | Current release gate: 2/2 passed |
| Release surface | `node tests/docs/ecc2-release-surface.test.js` | 0 failures | Current release gate: 27/27 passed after refreshing the discussion-count assertion to the post-PR #2005 baseline | | Release surface | `node tests/docs/ecc2-release-surface.test.js` | 0 failures | Current release gate: 27/27 passed after refreshing the discussion-count assertion to the post-PR #2005 baseline |

View File

@@ -472,7 +472,7 @@ function buildLocalEvidenceChecks(rootDir) {
), ),
buildCheck( buildCheck(
'release-evidence-current', 'release-evidence-current',
includesAll(evidence, ['Release video suite', 'growth outreach', 'Operator dashboard', 'GitGuardian', 'macOS/Ubuntu/Windows test matrix', '2560 passed']) ? 'pass' : 'fail', includesAll(evidence, ['Release video suite', 'growth outreach', 'Operator dashboard', 'GitGuardian', 'macOS/Ubuntu/Windows test matrix', '2568 passed']) ? 'pass' : 'fail',
'rc.1 evidence includes current release, video, growth, and CI artifacts', 'rc.1 evidence includes current release, video, growth, and CI artifacts',
{ path: 'docs/releases/2.0.0-rc.1/publication-evidence-2026-05-19.md' } { path: 'docs/releases/2.0.0-rc.1/publication-evidence-2026-05-19.md' }
), ),

View File

@@ -259,7 +259,7 @@ test('GA roadmap mirrors the current May 19 release evidence', () => {
for (const marker of [ for (const marker of [
'owner-approval-packet-2026-05-19.md', 'owner-approval-packet-2026-05-19.md',
'preview-pack smoke digest `531328aaaa53`', 'preview-pack smoke digest `531328aaaa53`',
'local 2560-test suite', 'local 2568-test suite',
'PR #2001', 'PR #2001',
'GitHub Actions run `26102500291`', 'GitHub Actions run `26102500291`',
'PR #2002', 'PR #2002',

View File

@@ -190,7 +190,7 @@ function seedRepo(rootDir, overrides = {}) {
'Operator dashboard', 'Operator dashboard',
'GitGuardian', 'GitGuardian',
'macOS/Ubuntu/Windows test matrix', 'macOS/Ubuntu/Windows test matrix',
'2560 passed', '2568 passed',
'Business baseline', 'Business baseline',
'$1,728/mo', '$1,728/mo',
'$8,272/mo' '$8,272/mo'
@@ -443,7 +443,7 @@ function runTests() {
'Operator dashboard', 'Operator dashboard',
'GitGuardian', 'GitGuardian',
'macOS/Ubuntu/Windows test matrix', 'macOS/Ubuntu/Windows test matrix',
'2560 passed', '2568 passed',
'Business baseline', 'Business baseline',
'$1,728/mo', '$1,728/mo',
'$8,272/mo', '$8,272/mo',

View File

@@ -68,7 +68,7 @@ function seedRepo(rootDir, overrides = {}) {
'Operator dashboard', 'Operator dashboard',
'GitGuardian', 'GitGuardian',
'macOS/Ubuntu/Windows test matrix', 'macOS/Ubuntu/Windows test matrix',
'2560 passed' '2568 passed'
].join('\n'), ].join('\n'),
'docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-19.md': [ 'docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-19.md': [
'This dashboard is generated by `npm run operator:dashboard`', 'This dashboard is generated by `npm run operator:dashboard`',
@@ -238,7 +238,7 @@ function runTests() {
'Operator dashboard', 'Operator dashboard',
'GitGuardian', 'GitGuardian',
'macOS/Ubuntu/Windows test matrix', 'macOS/Ubuntu/Windows test matrix',
'2546 passed' '2560 passed'
].join('\n') ].join('\n')
}); });