mirror of
https://github.com/affaan-m/everything-claude-code.git
synced 2026-05-17 22:33:06 +08:00
docs: sync May 17 roadmap evidence
This commit is contained in:
@@ -14,18 +14,15 @@ execution truth is split across:
|
||||
|
||||
## Current Evidence
|
||||
|
||||
As of 2026-05-16:
|
||||
As of 2026-05-17:
|
||||
|
||||
- GitHub queues are clean across `affaan-m/everything-claude-code`,
|
||||
`affaan-m/agentshield`, `affaan-m/JARVIS`, `ECC-Tools/ECC-Tools`, and
|
||||
`ECC-Tools/ECC-website`: the latest sweep found 6 open PRs and 3 open issues
|
||||
across all five repos: five new Dependabot PRs (#1959-#1963), the
|
||||
intentionally held Japanese localization PR/issue pair (#1953/#1951) with
|
||||
maintainer changes requested after parity validation, and two new trunk
|
||||
issues (#1957/#1958) awaiting the next queue batch. ECC Tools org
|
||||
verification requires
|
||||
`env -u GITHUB_TOKEN` in this shell so the configured GitHub host credential
|
||||
is used instead of the incompatible environment token.
|
||||
`ECC-Tools/ECC-website`: the latest `platform-audit` sweep found 0 open PRs,
|
||||
0 open issues, 0 discussion maintainer-touch gaps, 0 answerable Q&A missing
|
||||
accepted answers, and 0 blocking dirty files when allowing the unrelated
|
||||
local `docs/drafts/` directory. The May 17 queue batch merged #1961, #1963,
|
||||
and #1953, closed/skipped incompatible #1962, and #1953 closed #1951.
|
||||
- GitHub discussions are current across those tracked repos:
|
||||
`affaan-m/everything-claude-code` has 58 total discussions and 0 without
|
||||
maintainer touch after May 15 maintainer updates on #73 and #1239; AgentShield,
|
||||
@@ -35,6 +32,21 @@ As of 2026-05-16:
|
||||
`ITO-59`) and five milestones: Security and Access Baseline, ECC 2.0 Preview
|
||||
and Publication, AgentShield Enterprise Iteration, ECC Tools Next-Level
|
||||
Platform, and Legacy Audit and Salvage.
|
||||
- Linear live sync is current for the May 17 merge batch: ITO-57 has a new
|
||||
supply-chain protection comment (`ca703b95-41a1-403e-9bc4-3d68edd4d4a3`),
|
||||
and the ECC platform project has a new operator progress snapshot
|
||||
(`6c4d1b92-95cf-4ea1-84fd-cbea36f24d1a`).
|
||||
- `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-17.md` records the
|
||||
May 17 queue-zero state, Japanese localization merge, Dependabot TypeScript
|
||||
and Node type merges, post-merge ja-JP lint repair, Mini Shai-Hulud/TanStack
|
||||
local protection recheck, npm audit/signature checks, current operator
|
||||
dashboard, and GitHub CI success for `99dd6ac0`.
|
||||
- `docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-17.md`
|
||||
regenerates the ITO-44 prompt-to-artifact dashboard from live platform audit
|
||||
evidence: PR queue, issue queue, discussion queue, local worktree gate,
|
||||
dashboard generation, and supply-chain loop are current; publication, plugin,
|
||||
billing, AgentShield, ECC Tools, legacy, and Linear/productized sync lanes
|
||||
remain the next work.
|
||||
- `docs/releases/2.0.0-rc.1/publication-evidence-2026-05-16.md` records the
|
||||
queue, discussion, Linear roadmap, ECC Tools access, Mini Shai-Hulud/TanStack
|
||||
full-campaign follow-up, scheduled supply-chain watch coverage, no-lifecycle
|
||||
@@ -52,11 +64,9 @@ As of 2026-05-16:
|
||||
- `npm run harness:audit -- --format json` reports 70/70 on current `main`.
|
||||
- `npm run observability:ready` reports 21/21 readiness on current `main`,
|
||||
including the GitHub/Linear/handoff/roadmap progress-sync contract.
|
||||
- `npm run operator:dashboard -- --allow-untracked docs/drafts/ --write
|
||||
docs/releases/2.0.0-rc.1/operator-readiness-dashboard-2026-05-15.md`
|
||||
now regenerates the ITO-44 prompt-to-artifact dashboard from live
|
||||
`platform:audit` evidence instead of leaving the operator snapshot as a
|
||||
hand-maintained document.
|
||||
- GitHub CI run `25983803011` completed successfully for
|
||||
`99dd6ac0db20fce51713b6a1c92515d2453b769e`, including Validate Components,
|
||||
Coverage, Lint, Security Scan, and the full Node/package-manager matrix.
|
||||
- PR #1846 merged as `797f283036904128bb1b348ae62019eb9f08cf39` and made
|
||||
npm registry signature verification a durable workflow-security gate:
|
||||
workflows that run `npm audit` now need `npm audit signatures`.
|
||||
@@ -557,12 +567,12 @@ is not complete unless the evidence column exists and has been freshly verified.
|
||||
|
||||
| Prompt requirement | Required artifact or gate | Current evidence | Status |
|
||||
| --- | --- | --- | --- |
|
||||
| Keep public PRs below 20 | Repo-family PR recheck | 0 open PRs across `everything-claude-code`, AgentShield, JARVIS, `ECC-Tools/ECC-Tools`, and `ECC-Tools/ECC-website` on 2026-05-13 after merging ECC #1860, AgentShield #78, JARVIS #13, and ECC-Tools #53 | Complete |
|
||||
| Keep public issues below 20 | Repo-family issue recheck | 0 open issues across `everything-claude-code`, AgentShield, JARVIS, `ECC-Tools/ECC-Tools`, and `ECC-Tools/ECC-website` on 2026-05-13 | Complete |
|
||||
| Manage repository discussions | Repo-family discussion recheck | GraphQL sweep returned 52 total trunk discussions with 0 open; AgentShield, JARVIS, ECC-Tools, and ECC-Tools website returned 0 total/open discussions | Complete |
|
||||
| Manage PR discussions | PR review/comment closure plus merge/close state | ECC #1860, AgentShield #78, JARVIS #13, and ECC-Tools #53/#54 merged after current-head CI/builds; no open tracked PRs remain | Complete |
|
||||
| Keep public PRs below 20 | Repo-family PR recheck | 0 open PRs across `everything-claude-code`, AgentShield, JARVIS, `ECC-Tools/ECC-Tools`, and `ECC-Tools/ECC-website` on 2026-05-17 after merging ECC #1961, #1963, and #1953 and closing/skipping incompatible #1962 | Complete |
|
||||
| Keep public issues below 20 | Repo-family issue recheck | 0 open issues across `everything-claude-code`, AgentShield, JARVIS, `ECC-Tools/ECC-Tools`, and `ECC-Tools/ECC-website` on 2026-05-17; #1951 closed with #1953 | Complete |
|
||||
| Manage repository discussions | Repo-family discussion recheck | Platform audit reports 0 discussion maintainer-touch gaps and 0 answerable Q&A missing accepted answers; trunk still has 58 total discussions | Complete |
|
||||
| Manage PR discussions | PR review/comment closure plus merge/close state | ECC #1961, #1963, and #1953 merged after maintainer validation; no open tracked PRs remain | Complete |
|
||||
| Salvage useful stale work | `docs/stale-pr-salvage-ledger.md` | Ledger records salvaged, superseded, skipped, and manual-review tails; #1815-#1818 added cost tracking, skill scout, frontend design guidance, code-reviewer false-positive guardrails, and the May 12 gap pass | Complete except translation/manual review tail |
|
||||
| ECC 2.0 preview pack ready | Release docs, quickstart, publication readiness, release notes | `docs/releases/2.0.0-rc.1/` and readiness docs are in-tree; May 13 evidence refresh records harness, adapter, observability, Node, lint, release-surface, npm publish-surface, and Rust checks | Needs final clean-checkout release approval |
|
||||
| ECC 2.0 preview pack ready | Release docs, quickstart, publication readiness, release notes | `docs/releases/2.0.0-rc.1/` and readiness docs are in-tree; May 17 evidence records queue-zero state, localized docs merge, supply-chain recheck, lint/test/security gates, operator dashboard, and successful GitHub CI on `99dd6ac0` | Needs final clean-checkout release approval |
|
||||
| Hermes specialized skills included safely | Hermes setup/import docs and sanitized skill surface | Hermes setup and import playbook are public; secrets stay local | Needs final release review |
|
||||
| Naming and rename readiness | Naming matrix across package/plugin/docs/social surfaces | `docs/releases/2.0.0-rc.1/naming-and-publication-matrix.md` records current package, repo, Claude plugin, Codex plugin, OpenCode, and npm availability evidence | Complete for rc.1; post-rc rename remains future work |
|
||||
| Claude and Codex plugin publication | Contact/submission path with required artifacts and status | Publication readiness, naming matrix, and May 12 dry-run evidence document plugin validation, clean-checkout Claude tag/install smoke, and Codex marketplace CLI shape | Needs explicit approval for real tag/push and marketplace submission |
|
||||
@@ -571,9 +581,9 @@ is not complete unless the evidence column exists and has been freshly verified.
|
||||
| ECC Tools next-level app | Billing audit, PR checks, deep analyzer, sync backlog, evaluator/RAG corpus, analysis-depth readiness, hosted execution planning, hosted CI diagnostics, hosted security evidence review, hosted harness compatibility audit, hosted reference-set evaluation, hosted AI routing/cost review, hosted team backlog routing, hosted depth-plan check-run, PR-comment hosted job dispatch, hosted job result history/check-runs, hosted result status command, status-aware depth-plan recommendations, hosted promotion readiness, hosted promotion output scoring, hosted promotion retrieval planning, hosted promotion judge contract, gated hosted promotion judge execution, payment-announcement readiness, AgentShield fleet-summary hosted routing, hosted finding source-evidence surfacing, and harness policy-route review | PRs #26-#43 plus #53-#78 landed with test evidence, including AgentShield evidence-pack gap routing, canonical bundle recognition, supply-chain signature gates, PR draft follow-up Linear tracking, evidence-backed/deep-ready repository classification, the `/api/analysis/depth-plan` hosted job plan, `/api/analysis/jobs/ci-diagnostics`, `/api/analysis/jobs/security-evidence-review`, `/api/analysis/jobs/harness-compatibility-audit`, `/api/analysis/jobs/reference-set-evaluation`, `/api/analysis/jobs/ai-routing-cost-review`, `/api/analysis/jobs/team-backlog-routing`, the `ECC Tools / Hosted Depth Plan` check-run, `/ecc-tools analyze --job ...` PR-comment dispatch, non-blocking per-hosted-job result check-runs backed by 30-day result cache records, `/ecc-tools analyze --job status` cache lookup, cache-aware next-job recommendations in the depth-plan check-run, the `ECC Tools / Hosted Promotion Readiness` corpus-backed PR check-run, deterministic hosted-output scoring against cached completed job artifacts/findings, ranked retrieval/model-prompt planning, the fail-closed `hosted-promotion-judge.v1` request contract, opt-in live model-judge execution behind hosted evidence, entitlement, budget, provider, executor, strict JSON, and citation gates, a fail-closed `/api/billing/readiness` `announcementGate` for native GitHub payments claims, `npm run billing:announcement-gate` as the non-secret operator verifier, hosted security findings for AgentShield fleet summaries, an `Evidence` column in hosted finding comments/check-runs, and hosted harness findings that route AgentShield fleet target paths to harness owners | Next work is hosted promotion telemetry, richer operator review UX, and live Marketplace test-account readback |
|
||||
| GitGuardian/Dependabot/CodeRabbit-style checks | Non-blocking taxonomy, deterministic follow-up checks, and local supply-chain gates | ECC-Tools risk taxonomy check plus follow-up signals landed, including Skill Quality, Deep Analyzer Evidence, Analyzer Corpus Evidence, RAG/Evaluator Evidence, PR Review/Salvage Evidence, and AgentShield evidence-pack evidence; #1846 added npm registry signature gates; #1848 added the supply-chain incident-response playbook and `pull_request_target` cache-poisoning validator guard; #1851 added the privileged checkout credential-persistence guard; AgentShield #78, JARVIS #13, and ECC-Tools #53 applied the same hardening outside trunk | Current supply-chain gate complete; deeper hosted review features remain future |
|
||||
| Harness-agnostic learning system | Audit, adapter matrix, observability, traces, promotion loop | Audit/adapters/observability gates plus `docs/architecture/evaluator-rag-prototype.md`, `examples/evaluator-rag-prototype/`, and ECC-Tools PR #40 define read-only stale-salvage, billing-readiness, CI-failure-diagnosis, harness-config-quality, AgentShield policy-exception, skill-quality evidence, deep-analyzer evidence, and RAG/evaluator comparison scenarios with trace, report, playbook, verifier, and predictive-check artifacts; ECC-Tools PRs #68-#72 now turn that corpus into a deterministic PR check-run gate with cached hosted-output scoring, ranked retrieval candidates, a model prompt seed, a fail-closed hosted model-judge request contract, and opt-in live model execution behind strict hosted-evidence gates | Deterministic hosted PR check, cached output scoring, retrieval planning, judge contract, and gated model execution integrated |
|
||||
| Linear roadmap is detailed | Linear project status plus repo mirror | Repo mirror exists; issue creation was retried on 2026-05-12 and remains blocked by the workspace free issue limit; this May 16/17 sync adds ECC #1860, AgentShield #78-#92, JARVIS #13, ECC-Tools #53-#78, current queue/discussion counts, Japanese localization triage, and a generated `operator:dashboard` prompt-to-artifact audit for recurring status updates | Needs recurring status updates after each significant merge batch |
|
||||
| Linear roadmap is detailed | Linear project status plus repo mirror | Repo mirror exists; issue creation was retried on 2026-05-12 and remains blocked by the workspace free issue limit; the May 17 sync adds the queue-zero batch, Japanese localization merge, ITO-57 live supply-chain refresh comment, ECC platform project progress snapshot, and generated `operator:dashboard` prompt-to-artifact audit for recurring status updates | Needs recurring status updates after each significant merge batch |
|
||||
| Flow separation and progress tracking | Flow lanes with owner artifacts and update cadence | This roadmap defines lanes below and `docs/architecture/progress-sync-contract.md` makes GitHub/Linear/handoff/roadmap sync part of the readiness gate | Active |
|
||||
| Realtime Linear sync | Project updates while issue limit is blocked; issues later | ECC-Tools #39 implements opt-in Linear API sync for deferred follow-up backlog items, and ECC-Tools #54 adds copy-ready PR drafts to that backlog when draft PR shells are not opened; `docs/architecture/progress-sync-contract.md` defines the local file-backed realtime boundary while issue capacity is blocked | Needs workspace capacity/config rollout |
|
||||
| Realtime Linear sync | Project updates while issue limit is blocked; issues later | ECC-Tools #39 implements opt-in Linear API sync for deferred follow-up backlog items, and ECC-Tools #54 adds copy-ready PR drafts to that backlog when draft PR shells are not opened; `docs/architecture/progress-sync-contract.md` defines the local file-backed realtime boundary while issue capacity is blocked; May 17 live connector comments were posted to ITO-57 and the ECC platform project | Needs workspace capacity/config rollout for productized issue sync |
|
||||
| Observability for self-use | Local readiness gate, traces, status snapshots, HUD/status contract, risk ledger, progress-sync contract | `npm run observability:ready` reports 21/21 | Complete for local gate |
|
||||
| Proper release and notifications | Release tag, npm publish state, plugin state, social posts | Publication readiness gate exists with May 12 dry-run and May 13 readiness evidence | Not complete; approval/live URLs required |
|
||||
|
||||
|
||||
Reference in New Issue
Block a user